ML19261B683
| ML19261B683 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 02/08/1979 |
| From: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| References | |
| NUDOCS 7902280477 | |
| Download: ML19261B683 (2) | |
Text
h j/"% 4 UNITED STATES O
- \\
NUCLEAR REGULATORY COMMisslON
$..k..,%_L.(, S REGION I
- (F
. j p.
t
$31 PARK AVENUE h
cf KING OF PRUS$l A PENNSYLVANI A 19406 j
n a 8,,,,
Docket Nos. 50-245 50-336 50-423 Northeast Nuclear Energy Company ATTN: Mr. W. G. Counsil Vice President - Nuclear Engineering and Operations P. O. Box 270 Hartford, Connecticut 06101 Gentlemen:
Enclosed is IE Bulletin 79-01 which requires action by you with regard to your power reactor facility (ies) with an operating license, except for the 11 Systematic Evaluation Program (SEP) plants which are listed in Enclosure 3.
This Bulletin is also being sent for information to the 11 SEP plants and all power reactor facilities with a construction permit.
No action or written response is required for these two categories of facilities.
Should you have questions regarding this Bulletin or the actions required of you, please contact this office.
Sincerely, So "
h Boyce H. Grier Director
Enclosures:
1.
List of IE Bulletins Issued in the past 12 months 3.
List of SEP Plants (11) 7902cs0 W
Northeast fluclear Energy Company 2
FEB g n3 cc w/encls:
J. F. Opeka, Station Superintendent D. G. Diedrick, Manager of Quality Assurance J. R. Himmelwright, Licensing Safeguards Engineer K. W. Gray, Construction Quality Assurance Lead H. R. flims, Director of fluclear Projects A. Z. Roisman, flatural Resources Defense Council