ML19261B439

From kanterella
Jump to navigation Jump to search
Responds to 790112 Telcon & Forwards Interim Rept on Significant Deficiency:S&M Constructors,Inc QA Program Breakdown Regarding Control of S&M Subcontractor,Halvorsen Boiler & Engineering Co.
Date released: 10/02/2019 Download: ML19261B439


Interim Rept on Significant Deficiency:S&M Constructors, Inc QA Program Breakdown Regarding Control of S&M Subcontractor,Halvorsen Boiler & Engineering Co.
ML19261B448
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 02/08/1979
From:
CLEVELAND ELECTRIC ILLUMINATING CO.
To:
References
Download: ML19261B448 (12)
Responds to 790112 Telcon & Forwards Interim Rept on Significant Deficiency:S&M Constructors,Inc QA Program Breakdown Regarding Control of S&M Subcontractor,Halvorsen Boiler & Engineering Co.
ML19261B438
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 02/12/1979
From: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19261B438 (1)