Appendix A NOTICE OF VIOLATION Commonwealth Edison Docket No. 50-373 Company Based on the results of an NRC inspection conducted on November E and 9, 1978, it appears that certain of your activities were in noncompliance with NRC requirements, as noted below.
This item is an infraction.
10 CFR 50, Appendix B, Criterion V states in part:
" Activities affecting quality.... shall be accomplished in accordance with drawings."
Commonwealth Edison Company, Topical Report CE-1-A, Revision 5, Section 5 states in part:
"The quality assurance actions carried out for design, construction.... will be described in documented drawings These dccuments will also reference applicable acceptance criteria which must be satisfied to assure that the quality related activity has been pr:operly carried out.
Contrary to the above, on November 8, 1978, the inspector observed that the reactor water level instrumentation pipe identified on Morrison Construction Company isemetric drawing No. NB-19. Rev. O was connected to the wrong instruments.
The installation had been accepted as being correct.