Text
-
I 6
d OPERATING DATA REPORT DOCKET NO.
050-0298 DATE 2-4 90 COMPLETED BY P-T.
%11fnger TELEPHONE in' a u -1811 OPERATING STATUS N
- 1. Unit Name:
Cooper Nuclear Station January 1980
- 2. Reporting Period:
2381
- 3. Licensed Thennal Power (MWt):
836
- 4. Nameplate Rating (Gross MWe):
720
- 5. Design Electrical Rating (Net 51We):
787
- 6. Maximum Dependable Capacity (Gross MWe):
764 7 Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
- 9. Power Level To which Restricted. lf Any (Net MWe):
N ne
- 10. Reasons For Restrictions.lf Any:
This Month Yr..to Date Cumulative
- 11. Hours in Reporting Period 744.0 744.0 48,985.0
- 12. Number Of Hours Reactor Was Critical 729.0 729.0 41.966.3
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On-Line 719.7 719.7 41,195.3 l' Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,506,480.0 1,506.480.0 77,689,206.0 17 Gross Electncal Energy Generated tMWH) 500.414.0,_,
500.414.0 25.039.262.0
- 18. Net Electrical Energy Generated iMWH) 482,289.0 482,289.0 24,140,566.0
- 19. Unit Service Factor 96.7 96.7 84.1 96.7 96.7 84.1
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 84.8 84.8 64.5
- 22. Unit Capacity Factor (Using DER Net) 83.3 83.3 63.3 3.3 3.3 4.6
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Nest 6 Months IType. Date.and Duration of Each):
Refueling and Maintenance. March 15, 1980. 8 weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status a Prior to Commercial Operations:
Forecast Achies ed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIA L OPERATION 1950 332 m eine
AVERAGE DAILY UNIT POWC2 LEVEL 050-0298 DOCKET NO.
UNIT rannor %ci ant Station DATE Fob ruarv 4 1980 COMPLETED BY P. L. Ballincer TELEPHONE 402-825-3811 MONT11 Januarv 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe NetI (MWe-Net i 1
661 g7 732 2
674 gg 731 3
751 39 377 102 4
725 20 5
721 23 432 6
574 33 578 7
722
- 3 654 g
766 24 642 9
756 25 641 10 752 626 26 751 11
- 7 445 12 7'4 23 545 13 733 681
,9 14 734 30 671 15 733 31 667 16 733 INSTRUCTIONS On this format. list the nerage daily unit power :evelin MWe Net for each day in the reporting month. Compute to the nearest whole megaw.itt.
to/77) 1950 a35
DOCKE NO.
050-0298 UNil SilllllK)WNS AND POWER REDilCliONS UNil N AME f'o o n e r Nociour Station 2-G80 Dt1E COMPLE ll D llY P. I.. Ba 111n.ggr RI POR I MONill January 1980 1 Ell filONE 402-825-3811 I nensee g e, h't
[3
'h
.).E raine & C nretine 3g 4
j C,5 I vent
~7 gV8 At enen in No.
lhic n.
y 5
3 53 Repois a mV Picscut Retnrien c H
=
o u
6 80-1 800106 S
O 9
4 N/A N/A N/A Power was reduced to allow adjustment of the control rod pattern.
80-2 800119 F
24.3 A
3 N/A N/A N/A Erroneous cuin generator ground fault Indication caused turbine to trip and reactor to scram.
Problem corrected and the reactor and generator re-turned to normal power operation.
80-1 800127 S
0 11 4
N/A N/A N/A Power was reduced to allow adjustment of the cont rol rod pattern.
i 2
3 4
I. l'osteil Reason:
Method:
1.sInbit G - Instinctiim A 1 quipment FailureILxplain) 1 -Manual los Picpaiation of Data S' Sibeiluleil e
11 Maintenance of Test 2 Manual Saam.
I nisy Shecis f or I Aensee w
C.Reincling 3-Automatic Sesam.
I sent Itepost ti i R)l'ile iNill(1 G.
g D RcEulasmy Rest:iction 4 Other IExplam) 0161) 1 Operator Training & Ikense l'umination F Administralise 5
G Operational I ison (1:= plain)
I shibit I - Same S.unce 19/77) 11 Othes Ilixplain) 4
COOPER NUCLEAR STATION OPERATIONS NARRATIVE January 1980 The unit operated the month of January at a capacity factor of 83.3%.
An unscheduled power outage occurred on January 19, 1980 due to an erroneous main generator ground f ault indication causing the turbine to trip and the reactor to scram. The problem was corrected and the re-actor and the generator returned to normal powar operation.
Scheduled power reductions were made on January 6 and January 27 to allow ad-justment of the centrol rod pattern.
1950 335