Text

-

I 6 d OPERATING DATA REPORT DOCKET NO. 050-0298 DATE 2-4 90 COMPLETED BY P- T. %11fnger TELEPHONE in' a u -1811 OPERATING STATUS Cooper Nuclear Station N

1. Unit Name:

January 1980

2. Reporting Period:

2381

3. Licensed Thennal Power (MWt):

836

4. Nameplate Rating (Gross MWe):

720

5. Design Electrical Rating (Net 51We):
6. Maximum Dependable Capacity (Gross MWe): 787 7 Maximum Dependable Capacity (Net MWe): 764
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To which Restricted. lf Any (Net MWe): None
10. Reasons For Restrictions.lf Any: N ne This Month Yr..to Date Cumulative
11. Hours in Reporting Period 744.0 744.0 48,985.0
12. Number Of Hours Reactor Was Critical 729.0 729.0 41.966.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line _

719.7 719.7 41,195.3 l' Unit Reserve Shutdown Hours 0.0 0.0 0.0

16. Gross Thermal Energy Generated (MWH) 1,506,480.0 1,506.480.0 77,689,206.0 17 Gross Electncal Energy Generated tMWH) 500.414.0,_, 500.414.0 25.039.262.0
18. Net Electrical Energy Generated iMWH) 482,289.0 482,289.0 24,140,566.0
19. Unit Service Factor 96.7 96.7 84.1
20. Unit Availability Factor 96.7 96.7 84.1
21. Unit Capacity Factor (Using MDC Net) 84.8 84.8 64.5
22. Unit Capacity Factor (Using DER Net) 83.3 83.3 63.3
23. Unit Forced Outage Rate 3.3 3.3 4.6
24. Shutdowns Scheduled Over Nest 6 Months IType. Date.and Duration of Each):

Refueling and Maintenance. March 15, 1980. 8 weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status a Prior to Commercial Operations: Forecast Achies ed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIA L OPERATION 1950 332 m eine -

AVERAGE DAILY UNIT POWC2 LEVEL DOCKET NO. 050-0298 UNIT rannor %ci ant Station DATE Fob ruarv 4 1980 COMPLETED BY P. L. Ballincer TELEPHONE 402-825-3811 MONT11 Januarv 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe NetI (MWe-Net i 1 661 g7 732 2 674 gg 731 3 751 39 377 4 725 20 102 ____

5 721 23 432 6 574 33 578 7 722 ;3 654 g 766 24 642 9 756 25 641 10 752 26 626 11 751 ;7 445 12 7'4 23 545 13 733 ,9 681 14 734 30 671 15 733 31 _ 667 16 733 INSTRUCTIONS On this format. list the nerage daily unit power :evelin MWe Net for each day in the reporting month. Compute to the nearest whole megaw.itt.

to/77) 1950 a35

DOCKE NO. 050-0298 UNil SilllllK)WNS AND POWER REDilCliONS UNil N AME f'o o n e r Nociour Station Dt1E 2-G80 COMPLE ll D llY P. I. . Ba 111n.ggr RI POR I MONill January 1980 1 Ell filONE 402-825-3811

, [3 'h .).E I nensee g e, h't8 raine & C nretine

n. 3g I vent At enen in No . lhic 4 j C,5 ~7 gV H y 5 3 53 =

Repois a mV o u

Picscut Retnrien c 6

80-1 800106 S O 9 4 N/A N/A N/A Power was reduced to allow adjustment of the control rod pattern.

80-2 800119 F 24.3 A 3 N/A N/A N/A Erroneous cuin generator ground fault Indication caused turbine to trip and reactor to scram. Problem corrected and the reactor and generator re-turned to normal power operation.

80-1 800127 S 0 11 4 N/A N/A N/A Power was reduced to allow adjustment of the cont rol rod pattern.

i 2 3 4 I . l'osteil Reason: Method: 1.sInbit G - Instinctiim S' Sibeiluleil - A 1 quipment FailureILxplain) 1 -Manual los Picpaiation of Data e 11 Maintenance of Test 2 Manual Saam. I nisy Shecis f or I Aensee w C.Reincling 3- Automatic Sesam. I sent Itepost ti i R)l'ile iNill(1 G.

g D RcEulasmy Rest:iction 4 Other IExplam) 0161) 1 Operator Training & Ikense l'umination

,# F Administralise 5 G Operational I ison (1:= plain) I shibit I - Same S.unce 19/77) 11 Othes Ilixplain) 4

COOPER NUCLEAR STATION OPERATIONS NARRATIVE January 1980 The unit operated the month of January at a capacity factor of 83.3%.

An unscheduled power outage occurred on January 19, 1980 due to an erroneous main generator ground f ault indication causing the turbine to trip and the reactor to scram. The problem was corrected and the re-actor and the generator returned to normal powar operation. Scheduled power reductions were made on January 6 and January 27 to allow ad-justment of the centrol rod pattern.

1950 335