OPERATING DATA REPORT 50-333 DOCKET NO.
DATE 5 Feb.80 C051PLETED BY E.Zufelt TELEPl!ONE (315 342-3840 OPERATING STA TUS
' "'*5
- 1. Unit Name:
FitzPatrick
- 2. Reporting Period:
800101-800131 2436
- 3. Licensed Thermal Power (5 twt):
- 4. Nameplate Rating (Gross StWe):
- 5. Design Electrical R:: ting (Net 51We):
830
- 6. 5!asimum Dependable Capacity (Gross 5tWe):
800
- 7. Sf aximum Dependable Capacity (Net 5tWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) M..ce Last Report, Gise Reasons:
- 9. Power LeScl To Which Restd-ted,If Any (Net 51We):
- 10. Reasons For Restrictions,if Any:
His 5fonth Yr..to.Da t e Cumulatise
- 11. Ilours in Reporting Period 744 744 39577
- 12. Number Of Ilours Reactor Was Critical 744 744 27374.2
- 13. Reactor Reserd Shutdown Hours 0
0 0
- 14. Ilours Generator on.Line 744 744 26482
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (5tWH) 1674240 1674240 52.852434
- 17. Gross Electrical Energy Generated (51WH) 577890 577890 1793100 _
559935 559935 17350510
- 18. Net Electrical Energy Generated (SIWH) 100.0%
100.0%
66.9%
- 19. Unit Service Factor 100.0%
100.0%
66.9%
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using 51DC Net) 94.1%
94.1%
60.4%
- 22. Unit Capacity Factor (Using DER Net) 91.7%
91.7%
53.4%
0.O%
0.O%
20.6%
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 5fonths (Type. Date,and Duration of Each):
Snubber i; spection and refuelina outace scheduled for April 1980
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units _in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIA L CRITICA LITY INITIA L ELECTRICITY C0515tERCIAL OPER ATION 1952 019 9.o o c120
4 AVERAGE DAILY L' NIT P0hER LEVEL DOCKET NO.
50-333 g3gy JAFNPP _
5 Feb.1980 DATE COMPLETED BY E.Zufelt TELEr!!ONE (315)342-3840 510Niy JANUARY, 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (51We-Net)
(S!We Net) 524 795 37 650 792 2
gg 742 796 3
39 4
781 795 20 5
777 795 21 777 796 6
22 7
775 795 23 8
774 794 24 9
771 792 25 10 769 789 26 752 790 gy 27 12 517 788 28 595 788 13 9
14 696 30 7R7 15 761 31 786 I6 792
SUMMARY
Unit operated at approximately 94% of rated thermal power for this reporting period.
On January 12, 1980, power was reduced for a control rod sequence exchange.
1952 020
UNITSilVTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-333 UNIT N AME JAFNPP DATE 5 Pgy. 1980 REPORT MONTil JANtIARY, 1980 COMPLETED SY E.Zutelt TELEPilONE (315)342-3840 e.
.! ?
s
.Y Licensee
,E v, E%
Cause & Corrective No.
Date g
3g
(
,g g 5 Event
(?
3 Action to
$E 3 5 =g Report =
in U Prevent Recurrence e
u O
1 800112 S
O 11 4
NA NA NA Reduced power to perform control l
rod sequence exchange N
CD N
I 2
3 4
F: Forced Reason:
Method:
Exlubit C Instructions S: Scheduled A. Equipment Failure (Explain) 1 Manual for Preparatma of Data
~
B. Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C. Refueling 3-Automatic Scram.
Event Report (LER) File (NUREC-D. Regulatory Resiriction 4.Other (Explain) 0161)
E. Operator Training & Ucense Examination F Administrative 5
G.Operaisunat Error (Explain) li Other (Explain)
Exhibit 1 Same Souree
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A.
FITZPATRICK NUCLEAR POWER PLANT NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE JANUARY 1980 The unit operated at approximately 94% of rated thermal power during this reporting period.
Power was reduced on January 12, 1980 to approximately 515 MW(e) to perform a control rod sequence exchange.
The rod sequence exchange was completed on January 13, 1980 and power was increased at the pre-conditioning rate.
1952'022
POWER AUTil0RITY OF TIIE STATE OF NEW YORK g
JAMES A. FITZPATRICK NUCLEAR POWER PLANT CD py Safety Related Electrical 6 Mechanical Maintenance Summary L/4 JANUARY 1980 WORK REQUEST 4 REPAIR DATE SYSTEh!
COMPONENT #
110W DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME Il0URS 4613 28 Dec 66 Visual Dirty filters Replaced filters 20 UC-22A-K 2833 28 Dec 23 Visual NRC Bulletin 79-02 inspect.
Repaired 1123-61 200'2 l123-61 2831 4 Jan 23 Visual NRC Bulletin 79-02 inspect.
Repaired ll23-55 185 1123-55
'872 3 Jan 76 Visual NRC Bulletin 79-02 inspect.
Repaired bfsk-664 14113 bfsk-664 3734 4 Jan 76 Visual NRC Bulletin 79-02 inspect.
Repaired bfsk-667 92 bfsk-667 2855 4 Jan 19 Visual Shock III overstress Modified 1119-135 104 1119-135 4046
!j 9 Jan 14 S1 V Ivo perator open bypass Adjusted open bypass limit switch 8
o MOV-12B limit switch out of rotor so torque switch is bypassed q
adjustment causing valve for sufficient valve travel when to be torque interrupted unscating valve.
when opening.
4735 9 Jan.
10 MOV-67 OPS Valve operator open bypass Adjusted open bypass limit switch 4
switch out of adjustment so torque switch is bypassed for causing valve to be torque sufficient valve travel when interrupted when opening.
unscating valve.
2870 9 Jan 46 1146-282 Visual NRC Bulletin 79-02 inspect.
Repaired ll46-282 88 3/4 2854 8 Jan 10 1110-218 Visual Shock III Analysis Modi fied 1110-218 268
POWER AUTl!0RITY OF TiiE STATE OF NEW YORK
{jk JAMES A. FITZPATRICK NUCLEAR POWER PLANT N
Safety Related Electrical 6 Mechanical Maintenance Summary
_)
rs)
Ja*
JANUARY 1980 5
WORK REQUEST #
REPAIR DATE SYSTEbl COMPONENT #
ll0W DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME Il0VRS 3818 7 Jan 66 1166.31 Visual NRC Bulletin 79-02 inspect.
Modified 1166-31 62 4761 10 Jan 88 CR-2 Visual Drive shaft pillow tack Replaced bearing bolts and tack 64 welds cracked.
welded in position.
4060 12 Jan 93 EDG-A OPS Open circuit in immersion Replaced immersion heater 54 heater.
2882 Visual NRC Hulletin 79-02 inspect.
Modified bfsk-659 (A-7A) 194 10 Jan 76 b fsk-659 ( A-7A) 3856 14 Jan 10 1110-28 Visual NRC Bulletin 79-02 inspect.
Repaired 1110-28 86h 2042 11 Jan 14 1114-66 Visual Shock III Analysis Modified l114-66 180k 2829 10 Jan 10 1110-261 Visual Shock III Analysis Modified 1110-261 264 3838 15 Jan 23 1123-14 Visual NRC Bulletin 79-02 inspect.
Repaired 1123-14 14lh 2875 17 Jan 23 l123-63 Visual NRC Bulletin 79-02 inspect.
Repaired 1123-63 20/
5009 Visual Pipe Stress Analysis Modified llanger "A" 5
16 Jan 76 Ilangar "A" 2874 15 Jan 23 1123-12 Visual NRC Bulletin 79-02 inspect Repaired 1123-12 291 i
POWER AtTfl10RITY OF Tl!E STATE OF NEW YORK
]
JAMES A. FITZPATRICK NUCLEAR POWER PLANT I'
Safety Related Electrical G Mechanical Maintenance Summary C) ps)
JANUARY 1980
.T' WORK REQUEST 4 REPAIR DA.fh.
SYSTEM COMPONENT #
110W DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME
!!OURS 3782
'S Jan 23 Visual NRC Bulletin 79-02 inspect.
Repaired IM3-13 Illh 1123-13 3788 15 Jan 23 Visual NRC Bulletin 79-02 inspect.
Repaired 1123-96 124 l123-96 4148 21 Jan 14 Visual Pipe flange bolts loose Tighten flange fasteners 1
R0-27B 2040 15 Jan 10 Visual Shock III Analysis Modified pfsk-639 Det A 172 pfsk-639 Det A 2860 15 Jan 23 Visual NRC Bulletin 79-02 inspect.
Repaired 1123-11 281k 1123-11 5003 21 Jan 15 Visual NRC Bulletin 79-02 inspect.
Modified Anchor A 236 Anchor A 5001 21 Jan 10 Visual NRC Bulletin 79-02 inspect.
Modified il10-98A 11 ll10-98A 5002 21 Jan 10 Visual NRC Bulletin 79-02 inspect.
Modified il10-98C 16 ll10-98C 5011 21 Jan 10 Visual NRC Bulletin 79-02 inspect.
Modi fied 1110-98B 11 ll10-988 5012 21 Jan 10 Visual NRC Bulletin 79-02 inspect.
bbdified il10-98D 11h ll10-98D 5017 22.lan 66 Visual NRC Bulletin 79-02 inspect.
Repaired Detail A 7
Detail A
y POWER AUT110RITY OF TIIB STATE OF NEW YORK
.g>
JAMES A. FITZPATRICK NUCLEAR POWER PLANT
&N Safety Related Electrical 6 Mechanical Maintenance Summary C2 JANUARY 1980 WORK REQUEST 4 REPAIR DATE.
SYSTEbl COMPONENT #
IION DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME Il0URS
~
3747 22 Jan 10 1110 3~79 Visual NRC Bulletin 79-02 inspect.
Repaired ll10-479 31 3748 22 Jan 10 Visual NRC Bulletin 79-02 inspect.
Repaired 1110-526 19 1110-526 4180 25 Jan 71 INV-3A OPS Failed filter capacitors Replaced capacitors 9
in inverter SCR legs.
2021 24 Jan 10 111o_34 Visual NRC Bulletin 79-02 inspect.
Repaired 1110-34 139 l
2056 28 Jan 10 pfsk-1327 Visual NRC Bulletin 79-02 inspect.
Repaired pfsk-1327 35 2876 24 Jan 10 ll10-390 Visual NRC Bulletin 79-02 inspect.
Repaired l110-390 74 (
2880 24 Jan 10 1110-130 Visual NRC Bulletin 79-02 inspect.
Repaired 1110-130 2435 3784 24 Jan 66 AZ-66-IN Visual Stress Analysis Modified AZ-66-IN 148h 5023
?4 Jan',
10 llanger f Visual Pipe Stress Analysis Modified llanger "f" 10 3733 8 Jan 46 1146-283 Visual NPC Bulletin 79-02 inspect.
Repaired 1146-283 49(
3736
'9 Jan 10 ll10-384 Visual NRC Bulletin 79-92 inspect.
Repaired 1110-384 37 s
POWER Atml0RITY OF Tl!E STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT
/-OtJ' Safety Related Electrical 6 Mechanical Maintenance Summary I'
JANUARY 1980 kO WORK REQUEST #
REPAIR DATE SYSTEM COMPONENT #
110W DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME Il0URS 3746 28 Jan 10 1110-535 Visual 1RC Bulletin 79-02 inspect.
Repaired 1110-535 141 3/4 3783 29.lan 66 hfsk-462EN Visual Stress Analysis Modified bfsk-462EN 198h t
e
/Df JAMES A. FIT 2 PATRICK NUCLEAR POWER PLANT d
g blaintenance Summary b$
JAN. 1980 - IGC D
r equest #
Cause of Results of Action taken to Repair Date System llow Detected Cemponent #
blalfunction blalfunction Preclude Time Recurrence (flours) 4098 ISP-3-2 checked 1/14/80 02-3 PS Unkn wn Failed ST-22C
.0 LIS-72A 10 times -ak 3684 Replaced 1/15/80 02-3 LIS-72A I6C NA NA LIS-72A 16.0 4159 Replaced 1/22/80 02-3 OPS Ground on switch Ground Switch 20.0 LIS-72A 1/15/80 03 OPS NA
?40 Roo 34-47 Computer Sat i s factory 4650 No " full in" Tightened 1/7/8C 03 OPS Loose Connector itPI 06-ll Indication Connector 7.0 4675 Constant Ili Calibrated and 1/7/80 06 LR/PR-97 OPS Drif t Alarm Adjusted 7.0 4583 Adjusted so 12/28/79 07 OPS Drift Failed ST-5B "B"
APRh1 2.0 inoSerablewith 11 nputs 4642 E #
' E 12/28/79 07 16C Failed ISP-22 SRF1 "D" Pre-Regulator Performed ISP 20 0 4645 Cleaned 12/28/79 07 SRbt "C" OPS Dirty Connector Did not respond Connectors 1.0 l
3689 Floisture in Spurious Replaced 12/29/79 07 SI41 "C" 16C Connectors Spiking Connectors 40.0 3859 Replaced / cleaned 12/ 29/~i 9 07 SRbl "A" IGC Dirty Connector Erratic Connectors
JAMES A. FITZPATRICK NUCLEAR POWER PLANT
/
Maintenance Summary h
.I AN, 1980 - IfC i
0 0
r Request f Cause of Results of Action taken to Repair Date System flow Detected Component #
Malfunction Malfunction Preclude Time Recurrence (llours) 1/3/30 07 4677 OPS Unknown Recorder Reads Found to be 2.0 PR-46D 1.ow working properly 1/3/80 07 4678 OPS Drift Failed ST-Sil Adjusted 2.0 APIBl "E" Downscale trip 1/4/80 07 4654 OPS Age / Drift Remote 1.cVel Replaced meter, 20.0 SIGl "C" Indication low IMP 7.1 3928 1/10/80 07 OPS Age /Use Spurious No plateau found 4.0 LPRM-36-05C Downscales Detector fat;ed 1/11/80 07 3983 OPS Age /Use Drifting Adjusted ilV to 4.0 1.PIBI-04 -29 EN n " PI '"""
I 1/.' 5 /80 07 OPS Age /Use Drifting 8.0 1.PI41 21B f
Reset Inop to it) 1/16/80 07 OPS NA NA 4.0
,,F, APRM LPRM vice 11 1.PRf 1/25/80 07 OPS Age Drift Itaised IIV.
15.0 1.PRM 05A 4049 Erroneous 1/11/80 10 GPS B d Relay I.S-100 Indication Replaced relay 3.0 4166 Circuit Breaker Turned Breaker 1/23/80 10 OPS No Power LS-100 Tu rned of f On 4*I 4544 Replaced 1/3/80 17 04-6B RES NA NA Detector 8.0 4581 Failed Found ok ISP-26 1/6/80 17 OPS Unknown 20.0 RIS-458B Downscale Satisfactory
/ O JAMES A. FITZPATRICK NUCLEAR P0hlR Pl. ANT g&
Maintenance Summary 0*rs.p
.l AN. 1980 - I T.C r
equest #
Cause of Results of Action taken to Repair Date System llow Detected Component #
Malfunction flalfunction Preclude Time Recurrence (llours) 4517 Defective module Replaced module 1/9/80 20 Annun 09-4-2-33 OPS on alarm card Constant alarm tested satis.
12.0 4089 Timers do not 1/22/80 20 Floor drain sump B OPS Timers on 09-4 time or operate Replaced timer 10.0 equip sump A timers as required 4626 1/6/80 66 OPS Drift Constant alarm Adjusted 8.0 TICS-107C 4698 liefective selector Ili Temperature Replaced 1/9/80 68 E3 6.0 TE-103 card in recorder Indicated Selector card 4085 Tested 1/15/80 93 PS-3A/4A OPS NA NA 6.0 Sat i s factory 4083 1/15/H0 93 OPS NA NA
- f 6.0 TS-SA f'