ML19260D428

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-267/79-19 on 791114-16 & 28-30.No Noncompliance Noted
ML19260D428
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 12/26/1979
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Millen C
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML19260D429 List:
References
NUDOCS 8002110036
Download: ML19260D428 (2)


See also: IR 05000267/1979019

Text

IV

C_

. s ' b

UNITED STATES

s

/

y\\

NUCLEAR REGULATORY COMMISSION

f ?

F *1

REGloN IV

E

"I l'd-

?,

611 RY AP' PLAZ A D RIVE. SUITE 1000

} . D [' ,y

ARL .NGToN, TEXAS 76012

AdpLea f ;

,

'.

'j

December 26, 1979

r

^

'

  • ,, =

In Reply Refer To:

, Docket No. 50-267/79-19

Public Service Company of Colorado

Attn:

Mr. C. K. Millen

Senior Vice President

P. O. Box 840

Denver, Colorado

80201

Gentlemen:

This refers to the inspection conducted by Mr. A. B. Beach of this office

during the period November 14-16, 1979, and Nove=ber 28-30, 1979, of activities

authorized by NRC Operating License DPR-34, and to his discussion of the

findings with members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in our report, which

is enclosed with this letter. Within these areas, the inspection consisted

of selective examination of procedures and re)resentative records, inter-

views with personnel, and observations by the inspector.

Within the scope of this inspection, no items of nonce =pliance were

identified.

Three new unresolved items are identified in paragraph 2 of the enclosed

report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10 Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you or your contractors believe to

be proprietary, it is necessary that you =ake a written application

within 20 days to this office to withheld such information from public

disclosure. Any such application must include a full statement of the

reasons on the basis of which it claimed that the infor=ation is pro-

prietary, and should be prepared so that proprietary infor=ation identified

in the application is contained in a separate part of the document.

If

we do not hear from you in this regard within the specified period, the

report will be placed in the Public Document Room.

I939 058

8 0o211 o <:>E3ag,

,

.

Public Service Company

of Colorado

-2-

December 26, 1979

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

-

.

,

l

D

G. L. Madsen, Chief

Reactor Operations and

Fuclear Support Branch

Enclosure:

IE Inspection Report No. 50-267/79-19

cc w/cnclosure:

D. W. Warembourg, Nuclear Production Manager

Fort St. Vrain Nuclear Station

P. O. Box 368

Platteville, Colorado

80651

L. Brey, Manager, Quality Assurance

(Same Address)

1939 059'