W shington Public Power Supply System A JOINT OPERATING AGENCY S
P. O. 80X 1223 ELM A. W ASHINGTON 98541 PHONE [206) 249 5001 January 31, 1980 G03-80-199 U. S. Nuclear Regulatory Commission Region V 1990 North California Boulevard Suite 202, Walnut Creek Plaza Walnut Creek, California 94596 Attention:
Mr. R. H. Engelken Director of Regulatory Operations
Dear Mr. Engelken:
Subject:
WPPSS NUCLEAR PROJECT NO. 3 DOCKET NUMBER 50-508 REPORTABLE DEFICIENCY, 10CFR50.55(e)
DEFECT / NONCOMPLIANCE REPORT N0. 008
Reference:
G03-79-2253, N. O. Strand to R. H. Engelken, same subject, dated December 3, 1979.
In accordance with the provisions of 10CFR50.55(e), your staff was informed by telephone on November 2, 1979 of a reportable condition involving the omission of vertical reinforcing steel in the shear wall separating the WNP-3 Fuel Handling Building and the Reactor Auxiliary Building. Attached is our final report concerning this deficiency.
All corrective action discussed in the final report will be imple-mented prior to our targeted placement of February 15, 1980.
Please contact us if you require additional information.