Text
/ 2C1
'
/
UNITED STATES
o
l'
- ~ ,t
NUCLEAR REGULATORY COMMISSION
$
E
REGION li
2
\\ ..... o #
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA. GEORGI A 30303
In Reply Refer To:
DEC 101979
RIIALC
50-348/79-40
Alabama Power Company
ATTN:
F. L. Clayton, Jr.
Senior Vice President
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
This refers to the inspection conducted by A. L. Cunningham of this office on
November 29-30, 1979, of activities authorized by hTC License No. NPF-2 for the
Joseph M. Farley Nuclear facility, and to the discussion of our findings held
with T. M. Arnold at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously reported
unresolved items. The status of these items is discussed in the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statemer.t of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
-
4
J. T. Sutherland, Chief
Fuel Facility and Materials
Safety Branch
1936 358
Enclosure:
See Page 2
8002070 15'
DEC 101979
'
Alabama Power Company
-2-
,
Enclosure:
Inspection Report No. 50-348/79-40
cc w/ enc 1:
A. R. Barton
Executive Vice President
P. O. Box 2641
Birmingham, AL 35291
J. T. Young
Vice President-Production
Post Office Box 2614
Birmingham, Alabama 35291
11. O. Thrash
Manager-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
C. Biddinger, Jr.
Manager-Corporate Quality Assurance
P. O. Box 2641
Birmingham, AL 35291
W. G. liairston, III
Plant Manager
Drawer 470
Ashford, AL 36312
R. E. Ilo11 ands, Jr.
QA Supervisor
P. O. Box U
Ashford, AL 36312
-
1936
359