Forwards IE Insp Repts 50-277/79-18 & 50-278/79-20 on 790701-31 & Notice of Violation.Details Withheld (Ref 10CFR2.790)
ML19260C500
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/12/1979
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML19260C499 List:
References
NUDOCS 8001070266
Download: ML19260C500 (2)


See also: IR 05000277/1979018

Text

UNITED ST ATES

8pa af cg#'$

'

NUCLEAR REGULATORY COMMisslON

n

REGION 1

$

,$

631 PARK AVENUE

  • '

f

KING OF PRUS$1 A, PENNSYLVANIA 19406

\\*.***/

OCT 12 1979

Docket Nos. 50-277

50-278

Philadelphia Electric Company

ATTN: fir. S. L. Daltroff

Vice President

Electric Production

2301 tsarket Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject: Combined Inspection 50-277/79-18 and 50-278/79-20

This refers to the inspection conducted by Mr. E. G. Greenman of this office on

July 1-31,1979 at Peach Bottom Atomic Power Station, Units 2 and 3, Delta,

Pennsylvania of activities authorized by NRC License Nos. DPR-44 and DPR-56 and

to the discussions of our findings held by Mr. Greenman with I4r. W. T. Ullrich

of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective exa..iinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Our inspector also verified the steps you have taken to correct the items of

noncompliance brought to your attention in a letter dated April 20, 1979.

We

have no further questions regarding your action at this time.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A.

This item of noncompliance

has been categorized into the levels as described in our correspondence to you

dated December 31, 1974.

This notice is sent to you pursuant to the provisions

of Section 2.201 of the NRC's " Rules of Practice", Part 2, Title 10, Code of

Federal Regulations.

Section 2.201 requires you to subnit to this office,

within twenty (20) days of your receipt of this notice, a written statement or

explanation in reply including:

(1) corrective steps which have been taken by

you and the results achieved; (2) corrective steps which will be taken to avoid

further items of noncompliance; and (3) the date when full compliance will be

achieved.

8001070

1696 249

PhihadelphiaElectricCompany

OCT 10 1979

2

.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter ano the enclosed in

spection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must be accompanied by an affidavit executed by the owner of the

infomation, which identifies the document or part sought to be withheld, and

which contains a statement of reasons which addresses with specificity the items

which will be considered by the Commission as listed in subparagraph (b)(4) of

Section 2.790.

The information sought to be withheld shall be incorporated as

far as possible into a sepa.-ate part of the affidavit.

If we do not hear from

you in this regard within the specified period, the report will be placed in the

Public Document Room.

Additionally, and in accordance with Section 2.790(d) of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations, documentation of

findings of your control and accounting procedures for safeguarding special

nuclear materials and your facility security procedures are exempt from disclosure;

therefore, the pertinent section of the inspection report and Appendix A, will

not be placed in the Public Document Room and will receive limited distribution.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Gf

"~

dn

. Brunner, Chief

Reactor Operaticas and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation *

2.

Office of Inspection and Enforcement Combined Inspection

Report Numbers 50-277/79-18 and 50-278/79-20 *

cc:

W. T. Ullrich, Station Superintendent (w/o Pg 7 of Report and Appendix A)*

Troy B. Conner, Jr., Esquire (Without Report) (Without Appendix A)*

Eugene J. Bradley, Esquire (Without Report) (Without Appendix A)*

Raymond L. Hovis, Esquire (Uithout Report) (Without Appendix A)*

Michael J. Scibinico, II, Assistant Attorney General (Without Report)

(Without Appendix A)*

  • Contains 2.790 Infomation

1696

250