| Site: | Sequoyah |
| Issue date: | 11/16/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19260C416 | List: |
| References | |
| NUDOCS 7912260303 | |
| Download: ML19260C415 (2) | |
See also: IR 05000327/1979063
Text
M
,
'
'o
UNITED STATES
M.8@
8
NUCLEAR REGULATORY COMMISSION
SJ;rg
~
n
$
nE
REGION 11
4
o,
~[
191 MARIETTA ST N.W.,SulTE 3100
b
%
o
ATLANTA. GEORGIA 30303
NOV 161979
In Reply Refer To:
RII:hJG
50-327/79-63
50-328/79-31
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
This refers to the inspection conducted by M. J. Gouge of this office on
October 30 - November 1, 1979 of activities au u rized by NRC Construction
Permit Nos. CPPR-72 and CPPR-73 for the Sequoyah Nuclear facility, and to the
discussion of our findings held with G. G. Stack at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
the- "ith you.
Sincerely,
c
-
C. E. Murphy,
ef
Reactor Construction and Engineering
Support Branch
Enclosure:
See Page 2
jgjg }gg
7
7 9122 60 D
.
9
Tennessee Valley Authority
-2-
NOV 161979
Enclosure:
Inspection Report Nos. 50-327/79-63
and 50-328/79-31
cc w/ encl:
G. G. Stack, Project Manager
P. O. Box 2000
Daisy, TN 37319
J. M. Ballentine
Plant Superintendent
.P. O. Box 2000
Daisy, TN 37319
J. F. Cox
400 Commerce Street
W10C131 C-K
Knoxville, TN 37902
D. L. Lambert, Project Engineer
400 Chestnut Street Tower II
Chattanooga, TN 37401
E. G. Beasley
Tennessee Valley Authority
309 Grant's Building
Knoxville, Tennessee 37902
1618 290