Forwards IE Insp Repts 50-327/79-63 & 50-328/79-31 on 791030-1101.No Noncompliance Noted
ML19260C415
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 11/16/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19260C416 List:
References
NUDOCS 7912260303
Download: ML19260C415 (2)


See also: IR 05000327/1979063

Text

M

,

'

'o

UNITED STATES

M.8@

8

NUCLEAR REGULATORY COMMISSION

SJ;rg

~

n

$

nE

REGION 11

4

o,

~[

191 MARIETTA ST N.W.,SulTE 3100

b

%

o

ATLANTA. GEORGIA 30303

NOV 161979

In Reply Refer To:

RII:hJG

50-327/79-63

50-328/79-31

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by M. J. Gouge of this office on

October 30 - November 1, 1979 of activities au u rized by NRC Construction

Permit Nos. CPPR-72 and CPPR-73 for the Sequoyah Nuclear facility, and to the

discussion of our findings held with G. G. Stack at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

the- "ith you.

Sincerely,

c

-

C. E. Murphy,

ef

Reactor Construction and Engineering

Support Branch

Enclosure:

See Page 2

jgjg }gg

7

7 9122 60 D

.

9

Tennessee Valley Authority

-2-

NOV 161979

Enclosure:

Inspection Report Nos. 50-327/79-63

and 50-328/79-31

cc w/ encl:

G. G. Stack, Project Manager

P. O. Box 2000

Daisy, TN 37319

J. M. Ballentine

Plant Superintendent

.P. O. Box 2000

Daisy, TN 37319

J. F. Cox

400 Commerce Street

W10C131 C-K

Knoxville, TN 37902

D. L. Lambert, Project Engineer

400 Chestnut Street Tower II

Chattanooga, TN 37401

E. G. Beasley

Tennessee Valley Authority

309 Grant's Building

Knoxville, Tennessee 37902