ML19260C359

From kanterella
Jump to navigation Jump to search
Forwards LER 79-107/03L-0
Date released: 10/01/2019 Download: ML19260C359


LER 79-107/03L-0:on 791120,following Routine Pressurizer Sampling,Chemical Addition Isolation Valve Would Not Close. Caused by Inadequate Design.Installed Mod 79-11-81 Providing Pneumatic Assist During Valve Closing
ML19260C363
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/12/1979
From: Lancaster K
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19260C363 (2)
Forwards LER 79-107/03L-0
ML19260C358
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/18/1979
From: Hancock J
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19260C358 (1)