ML19260C086

From kanterella
Jump to navigation Jump to search
Ack Receipt of Interagency Task Force Rept.Committee Will Discuss Rept at June 1979 Meeting
ML19260C086
Person / Time
Issue date: 05/15/1979
From: Carbon M
Advisory Committee on Reactor Safeguards
To: Taylor L
NATIONAL COUNCIL ON RADIATION PROTECTION & MEASUREMEN
Shared Package
ML19260C083 List:
References
1638, ACRS-1638, NUDOCS 7912180522
Download: ML19260C086 (1)


Text

[ gas arc,,^%,

o UNITED STATES y

  • q [ g NUCLEAR REGULATORY COMMISSION

/

E 3-ADVISORY COMMITTEE ON REACTOR SAFEGUARDS k*.

WASIIINGTON. D. C. 20555 May 15, 1979 APPEliDIX XXXII Letter to Cr. L. S. Taylor on Interacency Task Force.'ie. cort on Institutional Arrangerents Dr. Lauriston S. Taylor National Council on Radiation Protection and Measurements 7910 Woodmont Avenue Suite 1016 Washington, D.C.

20014

Dear Dr. Taylor:

I would like to thank you on behalf of the ACRS, for providi:q us with a copy of the Interagency Task Force (ITF) Report on Institutional Arrange-ments. 'Ihe Committee is currently scheduled to discuss the ITF Report itself with Mr. Libassi during its June meeting and will take such action as seems appropriate following that discussion.

Sireerely, Max W. Carbon Chairman 1613 018 A -%8 791218 6 N

APPEtiDIX XXXIII Additional Cocuments for ACRS' Use 1.

Letter, G. F. Trotiridge, Shaw, Pittman, Potts, and Trowbridge, to R. F. Fraley, Executive Director, ACRS, dated May 10, 1979, on TMI-2 Interviews.

2.

"emorandum, Commissioner Gilinsky to Commissioners Hendrie, Kennedy, Sradford, and Ahearne, on Bailly Generating Station's pilings.

3.

l'emorandum, Commissioner Gilinsky to M. W. Carbon, Chairman, ACRS, requesting infomation on relative merits of Zircaloy vs. Stainless Steel for reactor fuel element cladcing.

4.

IE Bulletin 79-05, Nuclear Incident at Three Mile Island.

5.

IE Bulletin 79-05A, Nuclear Incident at Three Mile Island.

6.

Telegram from NRC to Licensees using B & W reactors, April 3,1979, con erning IE Bulletin 79-05A.

7.

IE Bulletin 79-05B, l'uclear Incident at Three Mile Island-Supplement.

3.

Extract of communications frcm B "s W to NRC, dated April 20, 1979.

9.

IE Bulletin 79-06, Review of Operational Errors and System Misalignments Identified during the Three Mile Island Incident, dated April 11, 1979.

10.

IE Bulletin 79-06A, Review of Operational Errors and System Misalignments Identified Curing the Three Mile Island Incident.

11.

IE Bulletin 79-06B, Review of Operational Errors and System Misalignments Identified during the Three Mile Island Incident.

12.

IE Bulletin 79-08, Events Relevant to Esiling Water Power Reactors Identified During the Three Mile Island Incident.

13. Feitorandum, G. R. Quittschreiber, ACRS Staff, to ACRS, Response of Combustion Engineering Plants to Three Mile Island Type Transients.
14. Letter, B. L. Griffin, Florida Power Corporation, to H. R. Centon, Director NRR, regarding post-TMI-2 requirements, dated April 27, 1979.
15. Letter, A. P. Pettat, Arkansas Power and Light Company, to H. R. Denton, regarding post-TMI-2 requirements dated April 26, 1979.
16. Memorandum to ACRS, Current Status of NRC chronology of events during the TMI-2 accident.
17. Letter, G. F. Trowbridge, Shaw, Pittman, Potts, and Trowbridge, to R. F. Fraley, dated May 7, 1979, on TMI-2 Interviews.

1613 019 M-wot

13. L'etter, J. J. tattimoe, Sacremento riunicipal Utility Cistrict to Harold R. Centon, regarding post-TMI-2 requirements.

19.

Evaluation of Transient Behavice and Snall Reactor Coolant System Breaks in the 177 fuel Assembly Plant, (Vol. I, Vol. II, and Appendices),;iay ?, 1979, Babcock and Wilcox.

20. Revised Appendix 1 to Evaluation of Transient Behavior and Small Reactor Coolant System Breaks in the 177 Fuel Assemoly Plant, "liatural Circulation in B & W Operating Plants" (Rev.1), May 8,1579.
21. Coeratino Procedure Guidelines for St'all Ereaks, May 5,1979, Babcock and Wilcox.
22. i'emorandum, A. Bates, ACRS Staff, to ACRS, ::RC Cormissioners Netino, Thursday, May 10, 1979, and attachments, May ll,1979.
23. Preliminary Annotated Secuence of Events March 28; 1979, (Rev. 0),

"cy 10, 1979.

24. fiemorandum, G. F. Trowbridge, Shaw, Pittman, Potts and Trewbridge, to R. F. Fraley, Three l tile Island iluclear Station. Unit 2. Plant Cooldown and Temcorary Modifications.
25. I!UREG - 0560, Staff Recor' on the Generic Assessment of Feedwater Transients in Pressurized Water Reactors Desicned by the Babcock and Wilcox Comoany, fiay 9,1979, Office of f4uclear Reactor Regulation.
26. ACRS Future Schedule, liay 7,1979.
27. Shutdown Order for Oconee Nuclear Station, Units 1-3, l'ay 7,1979.
23. Shutdown Order for Rancho Seco fiuclear Generating Station, !!ay 7,1979.
29. Letter, W. O. Parker, Jr., Duke Pcwer Ccmpany to R. W. Reid, Chief, Cperating Reactors Branch #4, UStiRC, regarding inprovements to the Emergency Feedwater 3ystems of Oconee Nuclear Station, ay 7,1979.
30. Letter, W. O. Parker, Jr., Duke Pcwer Company, to H. R. Centon regarding improvements to the Emergency Feedwater System of Cconee

?!uclear Station, April 25, 1979.

31. cetter, L.E. Roe, Toledo Edison Co. to H. R. Centon, regarding modifications to systems and procedures of Davis-Besse Unit 1,
tay 4,1979.
32. Letter, J. J. !!attimoe, Sacremento ftunicipal Utilities District to H. R. Denton, regarding modifications to systems and procedures of Rancho Seco f uclear Stations, April 27, 1979.
33. Letter, William Cavanaugn III, Arkansas Power and Light Comcany to H. R. Centon, regarding modifications to systems and procedures of Arkansas !!uclear One, Unit 1.

l'ay 3, 1979.

1613 020 A-V/d

24. Letter, W. S. Let=, Duke Power Company to H. R. Centon regarding modifications to systems and procedures of Cconee ?!uclear Station, Units 1-3, April 26,1979.
35. Letter, B. L. Griffin, Florida Power Corporation to H. R. Denten regarding mcdificaticns to systems and procedures of Crystal River Unit 3.
36. Summary of Responses to IE Sulletin 79-08 (General Electric Reactors),

May 9, 1979.

37. Summary of Responses to IE Bulletin 79-06B (Ccebustion Engineering Reactors), May 8, 1979.
38. Summary of Pespcnses to IE Bulletin 79-06A (!!estinghouse Reactors),

l'ay 7,1979.

39. fiemorandum, J. G. Davis, I. E. to NRC Commissioners, Pressure Spike in Three Mile Island Unit 2-Gentainment.
40. PNO-79-67 AM, Preliminary f ctificaticn of an Event or Unusual occurrence, May 7, 1979.
41. Letter frcm Environmental Center of San Luis Obispo County, CA, tc S. Lawroski, ACRS, April 12, 1979.
42. Memorandum, P. J. Pirsiani, ANL, to E. E. Till and S. Lawroski, AHL, Three Mile Island Incident, May' 1,1979.
43. Letter, B. L. Griffin, Florida Power Corporation, to H. R. Centon, regarding modifications to systems and procedures of Crystal River, Unit 3, May 1,1979.

44.

Letter, J. G. Herbein, Metropolitan Edison Ccmpany to H. R. Centon, regarding the sequencing of events spanning the TMI-2 accident, April 16, 1979.

45. Letter, William Cavanaugh III to R. W. Reid, NRC Staff, in response to IE Sulletin 79-05B, April 24, 1979.
46. Letter, J. J. "attimce, Sacramento Municipal Utility District to H. R. Denton, in response to IE Bulletin 79-05B, April 27, 1979.
47. Letter, B. L. Gri ffin. Florida Power Corgnration to H. R. Centon, on improvenent of operation of Crystal River Unit 3, April 27,1979.
48. Letter from B. C. and D. Paw 1cwski, San Luis Ubispo, CA to S. Lawroski.
49. Letter, J. H. Taylor, B & W to H. R. Centon, Intecrated Centrol Systems, April 28,1979.
50. Responses to IE Bulletins79-06A, 79-06B, and 79-C6, including responses from Yankee Atomic, Wisconsin Electric Power, Indiana and liicnigan Power, 1613 021 A-vr

Duquesr.e Li ht, Southern Californic Edison, f*aine Yankee, lliagara S

'onawk, Georgia Pcwer, Consumers Pcwer, Philadelphia Electric, and Fortland General Electric.

1613 022

>