- ,,k' UNITED STATES 8 ' 3 #q ' %
NUCLEAR REGULATORY COMMISSION O
- k*"'[' #
WASHINGTON. D. C. 20S55 t
NOV 161979 MEMORANDUM FOR:
V. Benaroya, Chief, Auxiliary Systems Branch, DSS FROM:
G. Lainas, Chief, Plant Systems Branch, D0R
SUBJECT:
FIRE PROTECTION ENGINEERING ASSISTANCE FROM DSS FOR PSB TEAM 1 EVALUATIONS D. Notley, a fire protection engineer on detail to PSB, had been assigned to assist in resolving open items in fire protection evaluations on those plants assigned to H. George, PSB Team 1.
Recently, H. George advised me that some of his team's evaluations were falling behind schedule because Mr. Notley must devote a substantial part of his time over the next two months to preparing information related to the proposed rule.
From discussions between yourself, R. Ferguson, and H. George, we understand that G. Harrison will be made available to assist H. George as required over the next two months.
To avoid confusion, we will provide infonnation to G. Harrison on one or two plants at a time. A note from G. Harrison to H. George providing positions or basis for acceptance will provide sufficient response. We will obtain G. Harrison's concurrence on draft SER supplements on those plants where he assisted in the review.
Attached is a list of items on plants assigned to H. George where we believe G. Harrison's assistance will be required over the next two months.
j'I J
<(
/ /<p'w 1 4 G. Lainas/Cpief Plant Systems Branch Division of Operating Reactors
Enclosure:
As stated
Contact:
H. George X-27136 cc w/ enclosure:
See page 2 O
k bk 335 t
7912180
. cc 'a/ enclosure:
G. Lainas R. Ferguson D. Notley G. Harrison H. George
\\\\
16M 558
~
ATTACHMENT FIRE PROTECTION ASSISTANCE FOR TEAM 1 - PSB INFO RECEIVED Arkansas 1:
3.2 Separation of Power Cables 1/
Due 11/28/79 3.12 Cable Penetration Firestops 1/
Due 12/28/79 Arkansas 2:
3.5 Protection of Hailway Cables 1/
Due 11/30/79 3.6 Protection of CSR Cables 1/
Due 3.7 Protection of Switchgear Cables 1/
Due 3.14 Smoke Detectors 1/
Due 3.15 Manual Hose Stations 1/
Due Big Rock Point:
3.1.3 Fire Detection System 1/3/
Rec'd. 8/31/79 3.1. 4 Fire Pump Header 1/3/
Rec'd.
3.1.13 Fire Barrier Penetrations 1/3/
Rec'd.
3.1.23 Recirculation Pump Area Sprinkler 1/3/
Rec'd.
3.1.25 Protection of RDS Cables 1/3/
Rec'd.
3.2.1 Fuel Pool Cooling 2/
Due 3.2.3 Cabling in Recirculation Pump Area 2/
Rec'd. 6/15/79 16 359
. INF0 RECEIVED Indian Point 2:
3.1. 4 Water Supply 1/
Rec'd. 11/2/79 3.1.15 Fire Detectors 1/
Rec'd.
3.1.16 Diesel Generator Protection 1/
Rec'd.
Indian Point 3:
3.1.13 Cable Penetration Firestop Test 1/
Rec'd. 6/19/78 Oyster Creek 3.1.4 Fire Detectors 1/4/
Rec'd. 8/31/79 3.1.5 Halon Suppression Systems 1/4/
Rec'd.
3.1.6 Water Spray Systems 1/4/
Rec'd.
3.1.7 Sprinkler Systems 1/4/
Rec'd.
3.1.16 Ventilation System Changes 1/4 Rec'd.
3.1.20 Alternate Water Supply 1/4/
Rec'd.
Palisades:
3.1.1 Sprinklers 1/
Past Due 3.1.5 Fire Barriers 1/
Rec'd. 9/29/78 3.1.10 Cable Firestops 1/
Rec'd.
\\\\
1604P 360
, INFO RECEIVED Rancho Seco:
3.1.5 Tubine Deck Corridor 1/
Due 11/30/79 3.1.22 Main Corridor - Grade Level 1/
Due 3.1.21 Electrical Penetration Area 1/
Due 3.1.27 Corridor to (-) 47 level 1/
Due 3.1.29 Containment Penetration Valve 1/
Due (West Area) 3.1.30 Containment Penetration Valve 1/
Due (East Area) 3.1.33 Reactor Building Protection 1/
Due 3.1.36 General 1/
Due Trojan:
3.1.7 Smoke Exhaust Fans 1/
Rec'd. 10/1/78 3.2.1 Cable Penetration Firestops 2/
Rec'd. 8/22/79 3.2.6 Containment Fire Suppression 2/
Rec'd. 1/9/79 3.2.7 Cable Penetration Area Fire Rec'd. 4/14/78 Protection 3/
1/ - Design Criteria Review 2/ - Incomplete Item Resolution 3/ - Already under review by G. Harrison 4/ - Review completed by G. Harrison 11/6/79
\\\\
16g 361