Forwards IE Insp Repts 50-373/79-35 & 50-374/79-24 on 791016-17.No Noncompliance Noted
ML19260C078
Person / Time
Site: LaSalle  
Issue date: 11/06/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19260C079 List:
References
NUDOCS 7912180333
Download: ML19260C078 (2)


See also: IR 05000373/1979035

Text

p *"'Go

+

o

UNITED STATES

!"

NUCLEAR REGULATORY COMMISSION

,

g

"

r

REGION lli

/[

o,

799 ROOSEVELT ROAD

GLEN ELLYN. ILLINOIS 60137

,

  • "**

yo,; c

M

.

Docket No. 50-373

Docket No. 50-374

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Manager of Nuclear

Operations

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the inspection conducted by Messrs. E. W. K. Lee and

J. H. Neisler of this office on October 16 and 17, 1979, of activities

at La Salle County Station, Units 1 and 2, authorized by NRC Construc-

tion Permits No. CPPR-99 and No. CPPR-100 and to the discussion of our

findings with Mr. L. J. Burke and others of your staff at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection.

Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room, except

as follows.

If this report contains information that you or your contractors

believe to be proprietary, you must apply in writing to this office, within

twenty days of your receipt of this letter, to withhold such information

from public disclosure. The application must include a full statement of

the reasons for which the information is considered proprietary, and should

be prepared so that proprietary information identified in the application

is contained in an enclosure to the application.

O

16N 350

3"

@

nutso

.

NOV 0

1979

Commonwealth Edison

-2-

,

Company

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

&

Af$$.

Gaston Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Reports No. 50-373/79-35

and No. 50-374/79-24

cc w/ encl:

Mr. D. L. Peoples, Director

of Nuclear Licensing

Mr

L. J. Burke, Site

Project Superintendent

Mr. T. E. Quaka, Quality

Assurance Supervisor

Mr. R. H. Holyoak, Station

Superintendent

Central Files

Reproduction Unit hTC 20b

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office of

Assistant Attorney General

k

16DT 351