ML19260C050

From kanterella
Jump to navigation Jump to search
Forwards Addl Questions Re Updating of Fes for Lacbwr. Deadline for Comments Is 791216.Requests Response If Unable to Comply W/Deadline
ML19260C050
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 11/16/1979
From: Ballard R
Office of Nuclear Reactor Regulation
To: Steels T
DAIRYLAND POWER COOPERATIVE
References
NUDOCS 7912180278
Download: ML19260C050 (3)


Text

.

'f j

' f Mou

,(

,o, UNITED STATES y j ) # q ',g NUCLEAR REGULATORY COMMISSION g,

E WASHINGTON, D. C. 20555 N%

/

NOV 16 1979 Docket No. 50-409 Mr. Thomas A. Steele Dairyland Power Cooperative 2615 East Avenue South Lacrosse, Wisconsin 54601

Dear Mr. Steele:

In updating the Final Environmental Statement for LACBWR the staff needs additional information to assist in its evaluations. As discussed by telephone, enclosed is a list of questions, the answers to which will assist us. The list is not complete and there will be additional questions which we will submit to you as they are prepared.

If a deadline of Decerber 16 cannot be met for your responses, please let me know or call the Environmental Project Manager, Robert P. Geckler, at (301) 492-8429.

Sincerely, icosfW (db tal

.= -

Ronald L. Ballard, Chief Environmental Projects Branch 1 Division of Site Safety and Environmental Analysis

Enclosure:

As stated 0

16M 184 2 R P, 7912180 Q

Docket No.50-409 November 15, 1979 QUESTIONS CONCERNED WITH LA CROSSE FES ER SECTION QUESTION 2.7 1.

Are any of the local plants or animals listed or proposed to be listed as u.s.

or Wisconsin endangered or threatened species?

2.

Were any endangered or threatened animal species known to be reproducing on the site (before construction)?

3.

What is the current use of pool 9 by waterfowl?

3.2 3.

Has there been any change in the trans-mission network?

4.3 5.

Was any potential habitat for endangered or threatened wildlife destroyed by the construction activities?

5.8.1 6.

Has operation of the plant disturbed nearby birds or mammals?

2.5 8.

Please provide detailed location map of wells described in Table 2.5-42R.

3.2 9.

Please provide monitoring data (including alkalinity) on ashpit #1 discharge.

1, 11

10. Please provide the following information:

Operation and maintenance and fuel costs, mills /kWh, for the past three years for La Crosse, as well as the cost of fuel, operation and maintenance for other units on the system and the cost of purchase power for the past Three years.

DES SECTION 8.1.2

11. Please explain the differences in Table 8.1-1 and recent testimony by DPC in hearings in October 1979, i.e. please correct and update the table.

\\

16M 185

. Docket No. 50-409 November 15, 1979 Water Quality 12..Has a WPDES been issued? If so, please

& biota provide a copy.

13. Please provide the most recent year's monitoring data on chlorination
14. How is the WPDES of 0.2 mg/l derived?
15. Please provide a copy of the 316(b) atudy with detailed information on on the intake if not in the report.
16. Please provide commercial fishing.

data in the area from the year 1971.

m

-w.

\\\\.

16D(

186

=

n

_