ML19260C019

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 70-0734/79-10 on 791015-19.No Noncompliance Noted.Major Areas Inspected:Procedures & Records Re Program for Controlling & Accounting for Snm. Insp Rept Withheld (Ref 10CFR2.790)
ML19260C019
Person / Time
Site: 07000734
Issue date: 11/08/1979
From: Norderhaug L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Wellhouser H
GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES, INC./GENER
References
NUDOCS 7912180244
Download: ML19260C019 (2)


Text

s,A b bl p* *

  • c

,(

oq[o, UNITED STATES y f)

,f g

NUCLEAR REGULATORY COMMISSION r

s.- r REGION V

.;. i o, [C'

[

1990 N. CALIFORNI A BOULEVARD

%, *' \\/

,e" SUITE 202. WALNUl* CREE K PLAZA

,,,e WALNUT CREEK, CALIFORNI A 94596

  • iDV 0 1979 Docket No.70-734 General Atomic Company P. O. Box 81608 San Diego, California 92138 Attention: Mr. H. N. Wellhouser, Director Nuclear Material Custody and Control Division Gentlemen:

Subject:

NRC Inspection This refers to the inspection conducted by Messers. B. Brock, G. Hamada, Y. Kcbori and A. Wieder of this office on October 15-19, 1979 of activities authorized under NRC License No. SNM-696.

It also refers to the discussion of our inspection findings held with Mr. K. Duffy and others at the con-clusion of the inspection.

The areas examined during the inspection included your program for controlling and accounting for special nuclear material pursuant to applicable provisions of Part 70, Title 10 Code of Federal Regulations, and specific requirements of your.icense. Within these areas, the inspection consisted of selective examinaticns of procedures and records, interviews with personnel and obser-vations by the inspector.

No items of noncompliance with NRC requirements were identified within the scope of this inspection.

1613 031 7912180

'2 4 4/

e, y. 6 ~

General Atomic Company iD!

] ig79 In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, documentation of findings of your con-trol and accounting procedures for safeguarding special nuclear materials are exempt from disclosure; therefore, the inspection report will not be placed in the Public Document Room and will receive limited distribution.

Sincerely,

a k

{ ChiefAs-L. R.

erhaug, Safeguards Branch

Enclosure:

IE Inspection Report No. 70-734/79-10 (IE-V-342) cc w/ enclosure:

W. Mcwry, Licensing Administrator 1613 032