ML19260C011

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-295/79-23 & 50-304/79-21 on 790702 & 0925.No Noncompliance Noted
ML19260C011
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 11/07/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19260C012 List:
References
NUDOCS 7912180224
Download: ML19260C011 (2)


See also: IR 05000295/1979023

Text

&

a nuou

/

q'o,

'

UNITED STATES

!

'g

NUCLEAR REGULATORY COMMISSION

s .,. ,

e

REGION lit

o

799 ROOSEVELT ROAD

'

GLEN ELLYN. ILLINOIS 60137

  • .. *

h'

1

-

Docket No. 50-295

Docket No. 50-304

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Manager of Nuclear

Operations

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the inspection conducted by Mr. K. R. Naidu of this office

on July 2, 1979, at the Leckenby Company and on September 25, 1979, at

your corporate office of activities related to the high density Spent

Fuel Storage Racks intended for installation at the Zion Nuclear Power

Station, Units 1 and 2, authorized by NRC Operating Licenses No. DPR-39

and No. DPR-48 and to the discussion of our findings with Mr. G. Marcus

of your staff at the conclusion of the inspection.

-

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of

a selective examination of procedures and representative records, obser-

vations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you or

your contractors believe to be proprietary, you must apply in writing to

this office, within twenty days of your recaipt of'this letter, to with-

hold such information from public disclosure. The application must

include a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary information

identified in the application is contained in an enclosure to the application.

1609

327

7912180 & N

O

1

.

Commonwealth Edison Company

-2-

N0s i

b79

,

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

kn'

Gaston Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Reports No. 50-295/79-23

and No. 50-304/79-21

cc w/ encl:

Mr. D. L. Peoples, Director

of Nuclear Licensing

Mr. N. Vandke, Plant

Superintendent

Central Files

,

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office of

Assistant Attorney General

1609

328