First Set of Interrogatories Directed to CA Energy Commission (Cec).Questions Meaning of Mechanics of Facility, Basic Reactor Physics, Overpressurization Protection & Other Terms Used in CEC Queries
ML19260B417
Person / Time
Site: Rancho Seco
Issue date: 11/09/1979
From: Hoefling R
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To:
CALIFORNIA, STATE OF
Shared Package
ML19260B410 List:
References
NUDOCS 7912100147
Download: ML19260B417 (7)


Text

.

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of

)

SACRAMENTO MUNICIPAL UTILITY Docket No. 50-312 (SP)

DISTRICT

)

(Rancho Seco Nuclear Generating Station)

)

FIRST SET OF NRC STAFF INTERROGATORIES TO THE CALIFORNIA ENERGY COMMISSION (CEC)

Pursuant to 10 CFR 6 2.740b, the following interrogatories are directed to CEC.V Each interrogatory, unless objected to, is to be answered separately and fully in writing, under oath or affinnation, by individuals having personal knowledge of the answers.

Section 2.740b requires interrogatories to be answered within 14 days of service.

Five days are added to this time when service is by mail pursuant to Section 2.710. Accordingly, responses to these interrogatories, which are served by mail on November 9,1979, are due to be filed on November 28, 1979.

Pursuant to Section 2.740(e), these interrogatories should be supplemented as required by the above-referenced rule.

If "NRC Staff Request to Produce Directed to the California Energy Commission -

(CEC)" is being served contemporaneously with these Staff interrogatories.

791 10

/

-2 Interrogatory 1 With regard to each of CEC's admitted issues,U provide the following information.

A.

Identify the individual (s), if any, whom CEC intends to present as witnesses in this proceeding on the subject matter of each of its issues.

The identification should include the individual's name, affiliation, and a summary of the educational and professional background of that individual.

B.

Provide a reasonable description of the substance of the testimony of any witness (es) that CEC intends to have testify with regard to each of its issues, including an identification of all documents that will be relied upon in that testimony.

C.

Following the substantive response to each of the subsequent interroga-tories posed by the Staff, identify all documents and studies relied upon by CEC in providing the answers to that interrogatory. The ider.tification should be specific to the portion of the document or study relied upon.

Studies shall include observations, calculations, literature and other types V

y By its " Order Ruling on Scope and Contentions" of October 5, 1979, the Atomic Safety and Licensing Board admitted CEC Issues 3-1, 3-2, 3-3, 5-1, and 5-2.

In addition, on October 24, 1979, CEC filed its " Restate-ment of Issues of Concern and Request for Clarification of Ruling" resub-mitting CEC Issues 1-1 and 1-12.

The Staff has no objection to these latter issues as restated.

The Staff is also posing interrogatories with respect to them.

Although the Staff recognizes that interrogatory responses on the part of CEC with regard to issues not yet admitted to the proceeding are not legally required, the Staff is hopeful that CEC will respond to these interrogatories in an effort to expedite the proceeding.

\\b\\1 b52

of work, whether recorded in writing or not, which consist of an examination or analysis of a phenomenon.

D.

Following the substantive response to each of the subsequent inter-rogatories posed by the Staff, identify by name and affiliation each indi-vidual who has knowledge which served as the basis for the answer to that interrogatory.

Interrogatory 2 The following questions deal with CEC Issue 3-1.

A.

Describe the maning of " personnel" as it is used in this issue. The description should specify by job function, position title or some other means to the personnel at issue.

B.

Describe the meaning of the term " mechanics of the facility" as that term is used in this issue.

Include in your description an identification of all the " mechanics" which you contend should be adequately understood.

Provide your reasons.

C.

Describe the tenn " basic reactor physics" as it is used in this issue.

The description should include those elements which you contend should be adequately understood.

Provide your reasons.

15\\7 555

. D.

Describe the "other fundamental aspects of its operation" as that term is used in this issue.

ihe description should identify specifically each of the "other fundamental aspects" that are embraced by this tem and which you contend should be adequately understood.

For each of these identified

" fundamental aspects", please provide the reasons for your contention that an adequate understanding of them is necessary.

Interrogatory 3 The following questions deal with CEC Issue 3-2.

A.

Describe the meaning of the tem " personnel" as that tem is used in this issue. The description should specify by job function, position title or some other means the personnel at issue.

6.

Provide the reasons fi r your concern on this issue.

Interrogatory 4 The following questions deal with CEC Issue 3-3.

A.

Describe the meaning of the tem " plant personnel" as that tem is used in this issue. The des, intion should specify by job function, position title or some other means the personnel at issue.

B.

Define the term " emergency instructions" as that term is used in this issue.

1517 534

C.

Provide the reasons for your concern on this issue.

Interrogatory 5 The following questions deal with CEC Issue 5-1.

A.

Describe the " systems" which are referenced in this issue.

B.

Provide the reasons for your concern on this issue.

Interrogatory 6 The following questions deal with CEC Issue 5-2.

A.

Define the term "overpressurization protection" as that term is used in this issue.

Describe the events which you contend could lead to an overpres-surization of the containment building.

Identify the degree of overpressuriza-tion involved.

Provide your reasons which support the need for overpressure protection for the events identified.

B.

Provide the reasons for your concern on this issue.

Interrogatory 7 The following questions deal with CEC Issue 5-3a.

1517 535

. A.

Define the term "special features" as that tenn is used in this issue.

Does CEC contend that additional "special features" are required at the Rancho Seco facility.

If so, icentify those "special features" and the reasons for your claim that such additional features are necessary.

B.

Identify the term " instruments" as that term is used in this issue.

Does CEC contend that additional instruments are necessary at the Rancho Seco facility? If so, describe the additional instrumentation rec;3i vid and the reasona to support your claim that such instrumentation is necessary.

C.

Provide the reasons for your concern on this issue.

Interrogatory 8 The following questions deal with CEC Issue 1-1.

A.

Define the tenn " pressure and volume control sensitivities" as that term is used in this issue.

Identify the source of the sensitivities, their nature and rea:ons for occurrence.

B.

Identify the " safety systems" referenced in this issue.

C.

Provide the reasons for your concern on this issue.

Interrogatory 9 The vollow Qg questions deal with CEC Issue 1-12.

1517 336

A.

Identify the " safety systems' referenced in this issue.

B.

Provide the reasons for your concern on this issue.

Respectfully submitted, t

/