ML19260B167

From kanterella
Jump to navigation Jump to search
Forwards LER 79-039/03L-0
Date released: 10/01/2019 Download: ML19260B167


LER 79-039/03L-0:on 791105,while Performing Average Power Range Monitor Surveillance Test & calibr,100% Flow Rod Block Setpoint on Channel 1 Found to Be 107% of Rated Neutron Flux.Caused by Instrument Drift.Channel 1 Readjusted
ML19260B174
Person / Time
Site: Oyster Creek
Issue date: 12/03/1979
From: Ross D
JERSEY CENTRAL POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19260B174 (3)
Forwards LER 79-039/03L-0
ML19260B166
Person / Time
Site: Oyster Creek
Issue date: 12/03/1979
From: Ross D
JERSEY CENTRAL POWER & LIGHT CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19260B166 (1)