Text
l0
Md&'2
m nra
[
o
UNITED STATES
gg
[
fgg
NUCLEAR RECULATORY COMMISSION
s
.: c
REGION II
g
'#
o
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 3o3o3
.....
OCT 't 1979
In Reply Refer To:
RII:LLJ
50-327/79-58
50-328/79-30
Tennessee Valley Authority
ntta:
H. G. Parris
Manager of Pover
500A Chestnut Street Tower II
Chattanooga, Tennessee 37401
Gentlemen:
This refers to the inspection conducted by L. L. Jackson of this office on
October 1-5, 1979 of activities authorized by NRC Construction Permit Nos.
CPPR-72 and CPPR-73 for the Sequoyah Nuclear Plant facility, and to the
discussion of >ur findings held with J. M. Ballentine at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a wri*. ten application within 20 days
to this office to withhold such information from public disclosure.
Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
1521
007
7912060N h
a
F
Tennessee Valley Authorlty
-2-
OCT e 3 1979
.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
itk 2
. T. Sutherland, Chief
Fuel Facility and Materials
Safety Branch
Enclosures:
Inspection Report Nos. 50-327/79-58
and 50-328/79-30
cc w/ enclosures:
G. G. Stack, Project Manager
Post Office Box 2000
Daisy, Tennessee 37319
J. M. Ballentine
Plant Superintendent
Post Office Box 2000
Daisy, Tennessee 37319
J. F. Cox
400 Commerce Street
W10C131 C-K
Knoxville, Tennessee 37902
D. L. Lambert, Project Engineer
400 Chestnut Street Tower II
Chattanooga, Tennessee 37401
E. G. Beasley
Tennessee Valley Authority
309 Grant's Building
Knoxville, Tennessee 37902
1521