Forwards IE Insp Repts 50-329/79-20 & 50-330/79-20 on 790918-20 & Notice of Violation
ML19260A822
Person / Time
Site: Midland
Issue date: 10/10/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML19260A823 List:
References
NUDOCS 7912030260
Download: ML19260A822 (2)


See also: IR 05000329/1979020

Text

%

[pa necog'o

UNITED STATES

.

8

NUCLEAR REGULATORY COMMISSION

-

o

$

E

REGION lit

799 ROOSEVELT ROAD

a

GLEN ELLYN. ILLINOIS 60137

o

.....

OCT 101979

Docket No. 50-329

Docket No. 50-330

Consumers Power Company

ATTN:

Mr. Stephen H. Howell

Vice President

1945 West Parnall Road

Jackson, MI 49201

Gentlemen:

This refers to the inspection conducted by Mr. K. R. Naidu of this office

on September 18-20, 1979, of activities at Midland Nuclear Power Plant,

Units 1 and 2, authorized by NRC Construction Permits No. CPPR-81 and

No. CPPR-82 and to the discussion of our findings with Messrs. T. Cooke,

J. Corley and others of your staff at the conclusion of the in.pection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of

a selective examination of procedures and representative reccrds, obser-

vations, and interviews with personnel.

During this inspection, certain of your activities appeared to be in

noncompliance with NRC requirements, as described in the enclosed

Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201 of

the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office within t'irty days of

a

your receipt of this notice s written statement or explanation in reply,

including for each item of noncompliance: (1) corrective action taken and

the results achieved; (2) corrective action to be taken to avoid further

noncompliance; and (3) the data when full compliance will be achieved.

1461

185

7912 030 Mo

.

OCT 10197S

2-

Consumers Power Company

-

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,

and your response to this letter will be placed in the NRC's Public

Document Room, except as follows. If the enclosures contain information

that you or your contractors believe .o be proprietary, you must apply in

writing to this office, within twenty days of your receipt of this letter,

to withhold such information from public disclosure. The application

must include a full statement of the reasons for which the information is

considered proprietary, and should be prepared so that proprietary inf or-

mation identified in the application is contained in an enclosure to the

application.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

- Gaston Fiorelli, Chief

Reactor Construction and

,

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Reports

No. 50-329/79-20 and

No. 50-330/79-20

cc w/encls:

Central Files

Reproduction Unit NRC 20b

]ffj

jg{

PDR

Local PDR

NSIC

TIC

Ronald Callen, Michigan Public

Service Commission

Dr. Wayne E. North

Myron M. Cherry, Chicago

.

$

L