Ack Receipt of NRC 791030 Request for Payment Re Approval of Tech Spec Change 61.No Change Occurred to Reporting Level for Radiochemical Engineer & Health Physicist to Warrant 791030 Reclassification as Class III Fee
ML19260A730
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/21/1979
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Harold Denton, Miller W
NRC OFFICE OF ADMINISTRATION (ADM), Office of Nuclear Reactor Regulation
References
NUDOCS 7912030171
Download: ML19260A730 (2)


Text

.k 8

Wisconsin Elecinc posta couraur 231 W. MICHIGAN. P.O. BOX 2046. MILWAUKEE. WI 53201 November 21, 1979 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D.C.

20555 Attention : Mr. William 0. Miller, Chief License Fee Management Branch Gentlemen:

DOCKET NOS. 50-266 AND 50-301 LICENSE AMENDMENT FEES TECHNICAL SPECIFICATION CHANGE RE UEST NO. 61 POINT BEACH NUCLEAR PLANT UNITS 1 AND 2 We received your letter dated October 30, 1979, which requested the payment of an additional sum of $4,400 for the approval of our license amendments for Tech-nical Specification Change Request No. 61 submitted with our letter dated September 26, 1979, Your basis for requesting this additional fee is that the reorganization of our plant administrative structure, which changed the reporting level for the Radiochemical Engineer and Health Physicist, constitutes a safety issue and is therefore subject to a Class III fee.

As discussed with members of your staff during several telephone conversations subsequent to the uritten submittal, the reporting level for the Health Physicist on radiological health and safety matters has not changed. Both tine existing Conduct of Plant Operations Chart (Technical Specification Figure 15.6.2-2) and the proposed revision to this chart have indicated that the Health Physicist hae an optional reporting route directly to the plant manager on all radiological health and safety matters. At the request of your staff we proposed and agreed to an additional clarification of the reporting route in the form of an expanded note 2 to this figure. This note further emphasizes this important reporting route. The point is, however, that in the matters of radiological health and safety concerns, there has been no change to the Technical Specifica-tions or the actual reporting procedures and priorf ties at the Point Beach Nuclear Plant. The changes proposed affect only routine administrative reporting functions.

4 1456 213 b\\"

-1 7 912 030 f 7 /

e Mr. Harold R. Denton, Director November 21, 1979 We thus mspectfully submit that our original fee determination is correct. The final evaluation of this application will, we believe, confirm this opinion.

Very truly yours,

/

s

.s C.W. Fay,Di/ector Nuclear Power Department 1456 214