ML19260A689
| ML19260A689 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 09/11/1979 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML19260A679 | List: |
| References | |
| 50-271-79-10, NUDOCS 7912030092 | |
| Download: ML19260A689 (1) | |
Text
.
APPENDIX A NOTICE OF VIOLATION Vermont Yankee Nuclear Power Corporation Docket No. 50-271 Based on the results of an NRC inspection conducted on July 10-13, 1979, it appears that one of your activities was not conducted in full compliance with the conditions of your license as indicated below.
This item is an infraction.
A.
Technical Specification 4.8.C.1.d requires that " samples of off gas effluents shall be taken at least every 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> and gamma radioactivity determined by gross or isotopic analysis."
Contrary to the above requirement the 96 hour0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> interval between samples was exceeded on at least six occasions between January 1 and May 31, 1979.
1466 135 7912030 hh