/C
UNITED STATES
o,j
8
NUCLEAR REGULATORY COMMISSION
,
a
e
REGION il
\\ ..... e #
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303
OCT 181979
In Reply Refer To:
RII:TJD
50-327/79-49
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
This refers to the inspection conducted by T. J.
Donat of this office on
September 17-21, 1979, of activities authorized by NRC Construction Permit No.
CPPR-72 for the Sequoyah facility, and to the discussion of our findings held
with J. M. Ballentine at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspectic,n consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Fart 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the _easons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
1464
727
7
p. c. y
R. C. Lewis, Acting Chief
Peactor Operations and Nuclear
Support Branch
Enclosure:
See Page 2
7912030Cb
Q
OCT 181979
Tennessee Valley Authority
-2-
.
Enclosure:
Inspection Report No. 50-327/79-49
cc w/ enc 1:
G. G. Stack, Project Manager
P. O. Box 2000
Daisy, TN 37319
J. M. Ballentine
Plant Superintendent
P. O. Box 2000
Daisy, TN 37319
D. L. Lambert, Project Engineer
400 Chestnut Street Tower II
Chattanooga, TN 37401
E. G. Beasley
Tennessee Valley Authority
309 Grant's Building
Knoxville, Tennessee 37902
Mr. J. F. Cox
400 Commerce Street
'410C231 C-K
Knoxville, Tennessee 37902
1464
328