ML19260A441

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Sys. Forwards Rept Prepared by Gilbert Associates.Actual Piping Configuration Does Not Deviate Significantly from Design.W/O Encl
ML19260A441
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/30/1979
From: Stewart W
FLORIDA POWER CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-79-14, NUDOCS 7911210126
Download: ML19260A441 (2)


Text

,

,4ff'y,,

&% avn

.e :.

v ca V. c 's i

' [, '

J s

Florida Po.OaaY*ONwer CCR October 30, 1979 File:

3 3 -a -3

!!r. J.

P. O'Reilly Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Suite 3100 101 Marietta Street, N.W.

Atlanta, GA 30303

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 IE Bulletin 79-14

Dear Mr. O'Reilly:

Enclosed is a copy of the IE Bulletin 79-14 Report for Florida Power Corporation's Crystal River Unit 3 Nuclear Plant, which was prepared by Gilbert Associates, Inc.

This report is the response of the Florida Power Corporation to NRC IE Bulletin 79-14, dated July 2, 1979, including Revision 1, dated July 18, 1978, Supplement 1, dated August 15, 1979, and Supplement 2, dated September 7, 1979, for the Crystal River Unit No. 3 power plant.

It is the conclusion of this report that, having completed the actions required by the Bulletin, the seismic analysis, as originally done, applies to the actual configuration:of safety-related piping systems.

Exceptions to this conclusion were of a type which do not compromise the safe operation of the plant and for which remedial actions have been completed or for which actions will be completed by the end of the next scheduled plant shutdown.

1382 119 7 911210 /$ ' Q 7g 77 General Office 32o1 Tnety fourtn street soutn. P O Box 14042. st Petersburg Flonda 33733 e 813-866h51 -

e Mr. J.

P.

O'Reilly Page Two October 30, 1979 If you have any questions regarding this report, please contact this office.

Very truly yours, FLORIDA POWER CORPORATION

^

A_>. ( -

[whtA W.

P.

Stewart Manager Nuclear Operations Simpson(lEBu179-14)DN75 Enclosure cc:

Director Office of Inspection & Enforcement U.S.

Nuclear Regulatory Commission Washington, DC 20555 Director Division of Operating Reactors Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 1382 120

.