[pn nsauq'o
UNITED STATES
l,
g
NUCLEAR REGULATORY COMMISSION
e
n
'
$
E
REGION lli
'
U[
799 ROOSEVELT ROAD
o,
,
GLEN ELLYN. ILLINOIS 60137
\\
o
OCT
1 1979
.
Docket No. 50-329
Docket No. 50-330
Consumers Power Company
ATTN:
Mr. Stephen H. Howell
Vice President
1945 West Parnali Road
Jackson, MI 49201
Gentlemen:
This refers to the inspection conducted by Mr. E. J. Gallagher of this
office on September 11-14, 1979, of activities at the Midland Nuclear
Power Plant construction site authorized by NRC Construction Permits
No. CPPR-81 and No. CPPR-82 and to the discussion of our findings with
Mr. B. J. Marguglio and others of your staff, and others of the Midland
site staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted of
a selective examination of procedures and representative records, obser-
vations, and interviews with personnel.
During this inspection, certain of your activities appeared to be in
noncompliance with NRC requirements, as described in the enclosed
Appendix A.
This notice is sent to you pursuant to the provisions of Section 2.201 of
the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office within thirty days of
your receipt of this notice a written statement or explanation in reply,
including for each item of noncompliance: (1) corrective action taken and
the results achieved; (2) corrective action to be taken to avoid further
noncompliance; and (3) the date when full compliance will be achieved.
Based on our telephone discussion with you on September 21, 1979, it is our
understanding that the personnel performing inspections of the prestressing
system whose qualifications we consider do not meet the provisions of Regu-
latory Guide 1.58 and ANSI N45.2.6 have been relieved from such duties until
further evaluation of the requirements and further discussion with the
Region III office. Please include in your response your plans to reconfirm
the qualifications of other personnel performing quality control inspections
on the Midland project.
T
1381
101
-
7911210 07 A
1
.
@
.
IISIO
'
Consumers Power Company
-2-
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,
and your response to this letter will be placed in the NRC's Public Document
Room, except as follows.
If the enclosures contain information that you or
your contractors believe to be proprietary, you must apply in writing to this
office, within twenty days of your receipt of this letter, to withhold such
information from public disclosure. The application must include a full
statement of the reasons for which the information is considered proprietary,
and should be prepared so that proprietary information identified in the
application is contained in an enclosure to the application.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
s
nh
-
Gaston Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection Reports
No. 50-329/79-19 and
No. 50-330/79-19