ML19260A184
| ML19260A184 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 09/28/1979 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Hines E DETROIT EDISON CO. |
| Shared Package | |
| ML19260A185 | List: |
| References | |
| NUDOCS 7911070196 | |
| Download: ML19260A184 (2) | |
See also: IR 05000341/1979020
Text
'o
UNITED STATES
!"
NUCLEAR REGULATORY COMMISSION
'
,
g
REGION lil
a
- #
799 ROOSEVELT ROAD
I
o
GLEN ELLYN. ILLINOIS 6o137
o
.....
SEP ~
1979
1
Docket No. 50-341
!-
THe Detroit Edison Company
A N:
Mr. Edward Hines, Assistant
Vice President and Manager
Quality Assurance
Gentlemen:
This refers to the inspection conducted by Mr. E. W. K. Lee
of this office on September 18-21, 1979, of activities at
Enrico Fermi, Unit 2, authorized by NRC Con,truction Permit
No. CPPR-87 and to the discussion of our findings with you
and others of the Fermi 2 project staff at the conclusion
of the inspection.
ine enclosed copy of our inspection report identifies areas
examined during the inspection. Within these areas, the
inspection consisted of a selective examination of procedures
and representative records, observations, and interviews with
personnel.
No iterus of noncompliance with NRC requirements were identified
during the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this
letter and the enclosed inspection report will be placed in the
NRC's Public Document Room, except as follows.
If this report
contains information that you or your contractors believe to be
proprietary, you must apply in writing to this office, within
twenty days of your receipt of this letter, to withhold such
information from public disclosure. The application must include
a full statement of the reasoits for which the in'ormation is con-
sidered proprietary, and shculd be prepared so that proprietary
information identified in the application is contained in an
enclosure to the application.
1299
313
+9
'
.E
i
-
1070 /k
f
.
0 5'- ~
1979
The Detroit Edison Company
-2-
We will gladly discuss any questions you have concerning this
inspection.
,.
!-
Sincerely,
,
.
.
,
'
G. Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection Report
No. 50-341/79-20
cc w/ encl:
Central Files
Reproduction Unit NRC 20b
Local PDR
Ronald Callen, Michigan Public
Service Commission
Eugene E. Thomas, Attorney
1299 3l4
i
9
'
s
$
g
.~
,
I