Tech Specs Change Request 33,Amend 1 to Amend DPR-50,App B to More Specifically Define Routine Environ Repts
ML19260A076
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 08/10/1976
From: Arnold R
METROPOLITAN EDISON CO.
To:
Shared Package
ML19260A073 List:
References
NUDOCS 7910290698
Download: ML19260A076 (34)


Text

. .

f METROPOLITAN EDISON COMPANY JERSEY CENTRAL POWER & LIGHT COMPANY AND PENNSYLVANIA ELECTRIC COMPANY THREE MIC ISLAND NUCLEAR STATION UNIT 1 Operating License No. DPR-50 Docket No. 50-289 Technical Specification Change Request No. 33 Amendment 1 to Anvendix B Licensee's request to change Appendix B to Operating License No. DPR-50 for Three Mile Island Nuclear Station Unit 1. As a part of this request, proposed replacement pages for Appendix B are also included.

!TfROPOLITAN EDISON COMPANY By /s/ R. C. Arnold Vice President-Generation Sworn and subscribed to me this 10th day of August , 1976.

/s/ Lawrence L. Lawyer Notary Public 1479 246

  1. 91029067f

Metropolitan Edison Company Three Mile Island Nuclear Station Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Technical Suecification Change Beauest No. 33, Amendment 1 Replace page 63 of Technical Specification Change Request No. 33, Amendment 1 with the attached replacement pages.

Reason For Change Request To more specifically define the content of routine environmental reports, in accordance with regulatory guide 4.8.

Environmental Analysis Justifying Prouosed Change As this Amendment to Technical Specification Change Request No. 33, Amendment 1 only further defines the content of routine reports, the environmental analysis submitted with that change request still applies.

Cost-Benefit Analysis Justifying Prouosed Change Same as Cost Benefit Analysis for Technical Specification Change Request No. 33, Amendment 1.

1479 247

j. Liquid and gaseous release operating procedure.
k. Ret : tor trip emergency procedure.
1. Loss of reactor coolant or reactor coolant pressure emergency procedure,
m. Post accident H2 purge procedure.

553 All procedures described above and all changes thereto vill be reviewed periodically under the cognizance of the Manager-Generation Engineering; however, temporary changes to these procedures which do not change the intent of the original procedure may be made providing such changes are approved by two members of the Plant Management Staff.

Such procedure change approval vill be documented.

5.6 Plant Reporting Reauirements 5.6.1 Routine Recorts

a. A:mual Environmental Operating Report Part A: Nonradiological Report. A report on the environmental surveillance programs for the previous 12 months of operation shall be submitted to the Director of the NRC Regional Office (with a copy to the Director, Office of Nuclear Reactor Regulation) as a separate document within 90 days after January 1 of each year. The report shall include summaries, interpretations, 1nd statistical evaluation of the results of the nonradiological environmental surveillance activities as deemed appropriate by the licensee and the environmental monitoring programs required by limiting conditions for operation for the report period, including a comparison with preoperational studies, operational controls (as appropriate), and previous environmental surveillance reports and an assessment of the observed impacts of the plant operation on the environment. If harmful effects or evidence of irreversible damage are detected by the monitoring, the licensee shall provide an analysis of the problem and a proposed course of action to alleviate the problem.

1479 248

- 63(a) -

Part B: Radiological Report. A report on the radiological environmental surveillance programs for the previous 12 months of operation shall be submitted to the Director cf the NRC Regional Office (with a copy to the Director, Office of Nuclear Reactor Regulation) as a separate document within 90 days after January 1 of each year. The reports shall include summaries, interpretaticns, and statistical evaluation of the results of the radiological environmental surveillance activities for the report period as deemed appropriate by the licensee including a comparison with' preoperational studies, operational controls (as appropriate), and previous environmental surveillance reports and an assessment of the observed impacts of the plant operation on the environment. The reports shall also include the results of land use censuses required by the specifications.

If barmful effects or evidence of irreversible damage are detected by the monitoring, the licensee shall provide an analysis of the problem and a proposed course of action to alleviate the problem.

Results of all radiological environmental samples taken shall be summarized and tabulated on an annual basis. In the event that some results are not available within the 90-day period, the report shall be submitted noting and explaining the reasons for the missing results. The missing data shall be submitted as soon as possible in a supplementary report.

b. Radioactive Effluent Release Report A report on the radioactive discharges released from the site durin6 the previous 6 months of operation shall be submitted to the Director of the NRC Regional Office (with a copy of the Director, Office of Nuclear Reactor Regulation) within 60 days after January 1 and July 1 of each year. The report shall include a summary of the quantities of radioactive liquid and gaseous effluent and solid waste released from the plant as outlined in Regulatory Guide 1.21" Measuring, Evaluating, and Reporting Radioactivity in Solid Wastes and Releases of Radf oactive Material in Liquid and Gaseous Effluents from Light-Water-Cooled Nt. clear Power Plants ," with data su=marized on a quarterly basis following the format of Appendix B thereof.

The report shall include a su= mary of the meteorological conditions concurrent with the release of gaseous effluents during each quarter es outlined in Regulatory Guide 1.21 with data su=marized on a quarterly basis following the format of Appendix B thereof.

1479 249