ML19259D598

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-346/79-23 on 790620-22,0702-03 & 0814-15
ML19259D598
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/17/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML19259D599 List:
References
TAC-40076, NUDOCS 7910250151
Download: ML19259D598 (2)


See also: IR 05000346/1979023

Text

  1. c#an ato%'o

.

UNITED STATES

g

!

NUCLEAR REGULATORY COMMISSION

o

3

A

E

REGION 111

.e

D[

799 ROOSEVELT ROAD

0,

e

%

o

GLEN ELLYN. ILLINOls 60137

Docket No. 50-346

Toledo Edison Company

ATTN:

Mr. Richard P. Crouse

Assistant Vice President - Energy

Supply

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the investi ation conducted by Messrs. I. T. Yin

3

and D. H. Danielson of this office on June 20-22, July 2-3, and

August 14-15, 1979, of activities at Davis-Besse Nuclear Power

Station, Unit 1, authorized by NRC License No. NPF-3 and to the

discussion of our findings with Mr. E. C. Novak and others on

September 7, 1979, at NRC office in Bethesda, Maryland.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the

inspection consisted of a selective examination of procec ares

and representative records, observations, and interviews with

personnel.

No items of noncompliance with NRC requirements were identified

during the course of this inspection.

In accordance with Section 2.790 of the NLC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this

letter and the enclosed inspection report will be placed in the

NRC's Public Document Room, except as follows.

If this report

contains information that you or your contractors believe to be

proprietary, you must apply in writing to this office, within

twenty days of your receipt of this letter, to withhold such

information from public disclosure. The application must include

a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary

information ide.atified in the application is contained in an

enclosure to the application.

1213

292

N 910 5 "Ist

.

SEP 171979

Toledo Edison Cw.pany

-2-

We will gladly discuss any questions you have concerning this

inupection.

Sincerely,

/

b h ls~

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

cc w/ encl:

Mr. T. Murray, Station

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Harold W. Kohn, Ohio Power

Siting Commission

Helen W. Evans, Director

State of Ohio

1213

293