Text
.
.
Sa sto
UNITED STATES
jo
NUCLEAR REGULATORY COMMisslON
y
n
REGION 1
5
[.
631 PAR % AVENUE
KING OF PRUSSIA. PENN5YLVANIA 19406
s,,,,
Docket Nos. 50-245
3gt i 9 13 3
50-336
Northeast Nuclear Energy Company
ATTN: Mr. W. G. Counsil
Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject: Combined Inspection 50-245/79-06 and 50-336/79-06
This refers to the inspection conducted by Dr. M. Shanbaky of this office on
March 12-16, 1979 at the Millstone Nuclear Power Station Site and at the cor-
porate offices in Hartford, Connecticut of activities authorized by NRC License
Nos. DPR-21 and DPR-65 and to the discussions of our findings held by Dr. Shanbaky
with Messrs. Opeka, Johnson, and other members of your staff at the conclusion
of the inspection, and to a subsequent telephone discussion between Dr. Shanbaky
with Messrs. Rodgers and Johnson on March 20, 1979.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Based on the results of this inspection, it appears that certain of your activi-
ties were not conducted in full compliance with NRC requirements, as set forth
in the Notice of Violation, enclosed herewith as Appendix A.
These items of
noncompliance have been categorized into the levels as described in our corre-
spondence to you dated December 31, 1974.
This notice is sent to you pursuant
to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to
this office, within twenty (20) days of your receipt of this notice, a written
statement or explanation in reply including:
(1) corrective steps which have
been taken by you and the results achieved; (2) corrective steps which will be
taken to avoid further items of noncompliance; and (3) the date when full compliance
will be achieved.
In accordance with Section 2.79L of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclos' ares will
be placed in the NRC's Public Document Room.
If this report contains any infor-
mation that you (or your contractor) believe to be proprietary, it is necessary
I16.!
\\61
b/ 73-
m
7910170
.
.
Northeast Muclear Energy Company
2
JUL 19 1973
that you make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must be accompanied
by an affidavit executed by the owner of the information, which identifies the
document or part sought to be withheld, and which contains a statement of reasons
which addresses with specificity the items which will be considered by the
Comission as listed in subparagraph (b) (4) of Section 2.790.
The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
t
George H. Smith, Chief
Fuel Facility and Material
Safety
Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Combined Inspection
Report Numbers 50-245/79-06 and 50-336/79-06
cc w/encls:
J. F. Opeka, Station Superintendent
D. G. Diedrick, Manager of Quality Assurance
J. R. Himmelwright, Licensing Safeguards Engineer
A. Z. Roisman, Natural Resources Defense Council (Without Report)
1l62
!62