Forwards IE Insp Repts 50-245/79-06 & 50-336/79-06 on 790312-16 & Notice of Violation
ML19259D247
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 07/19/1979
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19259D244 List:
References
NUDOCS 7910170475
Download: ML19259D247 (2)


See also: IR 05000245/1979006

Text

.

.

Sa sto

UNITED STATES

jo

NUCLEAR REGULATORY COMMisslON

y

n

REGION 1

5

[.

631 PAR % AVENUE

KING OF PRUSSIA. PENN5YLVANIA 19406

s,,,,

Docket Nos. 50-245

3gt i 9 13 3

50-336

Northeast Nuclear Energy Company

ATTN: Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject: Combined Inspection 50-245/79-06 and 50-336/79-06

This refers to the inspection conducted by Dr. M. Shanbaky of this office on

March 12-16, 1979 at the Millstone Nuclear Power Station Site and at the cor-

porate offices in Hartford, Connecticut of activities authorized by NRC License

Nos. DPR-21 and DPR-65 and to the discussions of our findings held by Dr. Shanbaky

with Messrs. Opeka, Johnson, and other members of your staff at the conclusion

of the inspection, and to a subsequent telephone discussion between Dr. Shanbaky

with Messrs. Rodgers and Johnson on March 20, 1979.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Based on the results of this inspection, it appears that certain of your activi-

ties were not conducted in full compliance with NRC requirements, as set forth

in the Notice of Violation, enclosed herewith as Appendix A.

These items of

noncompliance have been categorized into the levels as described in our corre-

spondence to you dated December 31, 1974.

This notice is sent to you pursuant

to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to

this office, within twenty (20) days of your receipt of this notice, a written

statement or explanation in reply including:

(1) corrective steps which have

been taken by you and the results achieved; (2) corrective steps which will be

taken to avoid further items of noncompliance; and (3) the date when full compliance

will be achieved.

In accordance with Section 2.79L of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclos' ares will

be placed in the NRC's Public Document Room.

If this report contains any infor-

mation that you (or your contractor) believe to be proprietary, it is necessary

I16.!

\\61

b/ 73-

m

7910170

.

.

Northeast Muclear Energy Company

2

JUL 19 1973

that you make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must be accompanied

by an affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement of reasons

which addresses with specificity the items which will be considered by the

Comission as listed in subparagraph (b) (4) of Section 2.790.

The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

t

George H. Smith, Chief

Fuel Facility and Material

Safety

Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Combined Inspection

Report Numbers 50-245/79-06 and 50-336/79-06

cc w/encls:

J. F. Opeka, Station Superintendent

D. G. Diedrick, Manager of Quality Assurance

J. R. Himmelwright, Licensing Safeguards Engineer

A. Z. Roisman, Natural Resources Defense Council (Without Report)

1l62

!62