IE Insp Rept 50-3-2/79-17 on 790523-25.No Noncompliance Noted.Major Areas Inspected:Licensee Organization & Administration,Operations & Maintenance & Preparation for Refueling Activities
ML19259D076
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/04/1979
From: Bradford W, Verdery E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19259D074 List:
References
50-302-79-17, NUDOCS 7908280817
Download: ML19259D076 (3)


Text

.

/

'o UNITED STATES

!" 3 E,,o NUCLEAR REGULATORY COMMISSION E

REGION 11 101 MARIETT A sT., N.W., sulT E 3100 g*[

0, ATLANT A, GEORGI A 30303 Report No. 50-302/79-17 Licensee:

Florida Power Corporation 3201 34th Street, South St. Petersburg. Florida 33733 Facility Name: Crystal River 3 Docket No. 50-302 License No. DPR-72 Inspection at a R er 3 Nuclear Power Plant near Crystal River, Florida Y

9 Inspector:

r r fo g

/

Da(e L gned N

Approved b.

. Verdery, Acting Se on CKief, RONSB D te S'igned

SUMMARY

Inspection on May 23-25, 1979 Areas Inspected This routine, unannounced inspection involved 18 inspector-hours onsite in the areas of licensee organization and administration, plant tour to observe operations and maintenance in progress, and preparation for refueling activities.

Results Of the three areas inspected, no apparent items of ncncompliance or deviations were identified.

-ot9 055 280 C 3908

9 DETAILS 1.

Persons Contacted Licensee Employees

  • G. P. Beatty, Plant Manager
  • W. R. Nichols, Operations Superintendent H. B. Lucas, Administrative Supervisor P. D. Breedlove, Office Manager
  • J. Cooper, Compliance Engineer Other licensee employees contacted included four technicians and five operators.
  • Attended exit interview.

2.

Exit Interview The inspection scope and findings were summar.ized on May 25, 1979 with those persons indicated in Paragraph I above. The licensee acknowledged the inspection findings.

3.

Licensee Action on Previous Inspection Findings (Closed) (IE Report 50-302/78-08) Adequacy of QA Records Storage (78-08-01)

The inspector verified that three hour rated fire doors had been installed on the temporary record storage vault which is used for record storage while micro-filming is in progres3.

4.

Unresolved Items Unresolved items were not identified during this inspection.

5.

Organization and Administration The inspector reviewed the licensee's organizational structure to verify:

That changes in the organizational structure and assignmer.ts had been reported to the Nuclear Regulatory Commission as required by the Technical Specifications.

That the organizational structure is as described in the Tech.ical Specifications.

-n'9 056

2 That those persons assigned to new or different positions satisfy the qualifications identified in the Technical Specifications.

That authorities and responsibilities are as delineated in the Technical Specifications.

6.

Plant Tour The inspector toured various areas of the plant to observe the following:

Plant cleanliness.

Operating and maintenance activities in the control room, auxiliary building, and the containment building.

Preparation D,r refueling operations.

^r'9 057

.