ML19259D043
| ML19259D043 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 08/17/1979 |
| From: | Beatty G FLORIDA POWER CORP. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| 79081-01P, 79081-1P, NUDOCS 7908280584 | |
| Download: ML19259D043 (1) | |
Text
. -...
^
4.
4 79081-01P
's USNRC REn "
ATtANTA.er
- m.
17 Avsust 1979 er__.r._2__oslh'E20 a61:.39 Office of Inspection & Enforce = rent 101 Marietta St.,
Suite 3100 Atlanta.,GA 30303 RE: Decket 50-302 Licensee OTR-72 This vill confirm a repcrt to Mr. B. Messitt ef year of fice at 1740 on 16 Aacust 1979, tha: at 1615 on 16 August 1979, it was discevered the:
Crystal River d3 encored into an Opera:icnal :!cde while in tun (2) action staterents. This crested an event centrary :e Ie-hnical $recifiestien 3.0.4 and is repertable under Technical Specificati:n 6.9.1.9.b.
The plant entered into " ode 3 at 1155 on 16 August 1979 as a result ef a Reactor trip, and returned to Mode 2 ? 1309 on 16 Accus: 1979.
The ascension inte Mode 2 and subsequent power eccurred when the gas cheerst -
grap5 (Tech. Frec. 3.6.4.1) and air handling f ans Anf-148 and A37-14D (Tech. Spec. 3.7.E.1) were declared inoperable.
The hesith and safety of the plant and general public were not endaneered as a result of this event.
A de: ailed repert of this event will fo11ew within fourteen (la) days.
Gwy P.
Beatty, Jr.
Nuclear Plant Mgr.
Crystal River Unit 63 Tierida Fever Corperation
/rc THIS DOCUMENT CONTAINS POOR QUAUTY PAGES 07 90 1
po3a
\\
7908280 h