Forwards IE Insp Repts 50-266/79-08 & 50-301/79-10 on 790612-14.No Noncompliance Noted
ML19259C816
Person / Time
Site: Point Beach  
Issue date: 06/25/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML19259C817 List:
References
NUDOCS 7908150225
Download: ML19259C816 (2)


See also: IR 05000266/1979008

Text

[ge af cq#'o,

To'

UNITED STATES

I-

' _.

/ %

NUCLEAR REGULATORY COMl%:SSION

l'

'

-

$

REGION 111

g

[

799 RoOSEVE LT ROAD

,

,

'%<

P

GLEN ELLYN, f LLINolS 60137

j

  • ....

JUht;5197k

.

Docket No. 50-266

Docket Nc. 50-301

Wisconsin Elect

ower Company

ATTN:

Mr. Sol bucstein

Executive Vice President

Power Plants

231 West Michigan

Milwaukee,' WI 53201

Gentlemen:

This refers to the inspection conducted by Mr. E. J. Gallagher of this

office on June 12-14, 1979, of activities at the Point Beach Nuclear

Power Plant, Units 1 and 2, authorized by NRC Operating Licenses No. DPR-24

and No. DPR-27 and to the discussion of our findings with Mr. G. Reed and

others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection.

Within these areas, the inspection consisted of a

selective examination of procedures and representative records, observations,

and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you or

your contractors believe to be proprietary, you must apply in writing to

this office, within twenty days of your receipt of this letter, to withhold

such information from public disclosure. The applicaticn must include a

full statement of the reasons for which the inforc ation is considered

proprietary, and should be prepared so that proprietary information

identified in the application is contained in an enclosure to the

application.

O57100

79081502,A C @

.

JUN 2 51971

I

Wisconsin Electric Power

-2-

Company

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

hnntA G

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Reports No. 50-266/79-08

and No 50-301/79-10

cc w/ encl:

Mr. G. A. Reed, Manager

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Sandra A. Base, Lakeshore

Citizens for Safe Energy

b5~,'101