Forwards IE Insp Repts 50-553/79-06 & 50-554/79-06 on 790508-11.No Noncompliance Noted
ML19259C605
Person / Time
Site: Phipps Bend  Tennessee Valley Authority icon.png
Issue date: 05/30/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19259C606 List:
References
NUDOCS 7907260133
Download: ML19259C605 (2)


See also: IR 05000553/1979006

Text

b

o nrog'o,

UNITED STATES

y

NUCLEAR REGULATORY COMMISSION

e $ ,, )'

,n

\\

E

REGION 11

ihV"/ *

!

101 MARIETT A sT.. N.W., sulTE 3100

ATLANTA, GEORGI A 30303

% .*.b"

...

WAY 30 E

In Reply Refer To:

RII:RWW

50-553/79-06

50-554/79-06

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by R. W. Wright of this office on May 8-

11, 1979, of activities authorized by NRC Construction Permit Nos. CPPR-162 and

CPPR-163 for the Phipps Bend Nuclear Plant Unit I and 2 facilities, and to the

discussion of our findings held with W. P. Kelleghan at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enfc. cement matters and unresclved items. The status of these items is discussed

in the enclosed report.

In accordance with SecMon 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhcid such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

2100 236

8'

7 9 0726 0\\M

.

.

...

_-

.

.-

..

~

314Y a 0 379

Tennessee Valley Authority

-2-

Should you have any questions concerning this letter, ,e will be glad to discuss

them with you.

Sincerely,

C. E. Murphy, Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

Inspection Report Nos. 50-553/79-06

and 50-554/79-06

cc w/ encl:

J. E. Gilleland

Assistant Manager of Power

500C Chestnut Street Tower II

Chattanooga, TN 37401

W. P. Kelleghan, Project Manager

P. O. Box 2000

Surgoinsville, TN 35752

J. F. Cox

400 Comerce Street

W10C131 C

Knoxville, TN 37902

2l00

237

J. E. Wills, Project Engineer

400 Chestnut Street Tower II

Chattanooga, TN 37401