ML19259C605
| ML19259C605 | |
| Person / Time | |
|---|---|
| Site: | Phipps Bend |
| Issue date: | 05/30/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19259C606 | List: |
| References | |
| NUDOCS 7907260133 | |
| Download: ML19259C605 (2) | |
See also: IR 05000553/1979006
Text
b
o nrog'o,
UNITED STATES
y
NUCLEAR REGULATORY COMMISSION
e $ ,, )'
,n
\\
E
REGION 11
ihV"/ *
!
101 MARIETT A sT.. N.W., sulTE 3100
ATLANTA, GEORGI A 30303
% .*.b"
...
WAY 30 E
In Reply Refer To:
RII:RWW
50-553/79-06
50-554/79-06
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
This refers to the inspection conducted by R. W. Wright of this office on May 8-
11, 1979, of activities authorized by NRC Construction Permit Nos. CPPR-162 and
CPPR-163 for the Phipps Bend Nuclear Plant Unit I and 2 facilities, and to the
discussion of our findings held with W. P. Kelleghan at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously identified
enfc. cement matters and unresclved items. The status of these items is discussed
in the enclosed report.
In accordance with SecMon 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhcid such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
2100 236
8'
7 9 0726 0\\M
.
.
...
_-
.
.-
..
~
314Y a 0 379
Tennessee Valley Authority
-2-
Should you have any questions concerning this letter, ,e will be glad to discuss
them with you.
Sincerely,
C. E. Murphy, Chief
Reactor Construction and Engineering
Support Branch
Enclosure:
Inspection Report Nos. 50-553/79-06
and 50-554/79-06
cc w/ encl:
J. E. Gilleland
Assistant Manager of Power
500C Chestnut Street Tower II
Chattanooga, TN 37401
W. P. Kelleghan, Project Manager
P. O. Box 2000
Surgoinsville, TN 35752
J. F. Cox
400 Comerce Street
W10C131 C
Knoxville, TN 37902
2l00
237
J. E. Wills, Project Engineer
400 Chestnut Street Tower II
Chattanooga, TN 37401