'.7c4 UNITF.D ST ATEs ba arGuq'o NUCLEAR REGULATORY COMMISSION t
p
+j REGION !!
T y, g
101 M ARIETT A STRE ET.N.W.
g g
8 ATLANTA. GEORGI A 30303
\\, ' " * * /
ApR 1 6 1979 In Reply Refer To:
RII:JPO THIS DOCUMENT C0tlTAltlS POOR QUAUTY PAGES Offshore Power Systems Attn:
Mr. A. P. Zeche11a, President 8000 Arlington Expressway P. O. Box 8000 Jacksonville, Florida 32211 Centlemen:
early notification of a
This Information Notice is provided as an possibly significant matter. It is expected that recipients will review the information for possible applicability to their facilities.
No this time.
If further NRC specific action or response is requested at evaluations so indicate, an IE Circular or Balletin will be issued to recommend or request specific licensee actions.
If you have questions regarding the matter, please contact the Director of the appropriate NRC Regional Office.
NE 3\\.' bm' James P. O'Reilly
- Director
Enclosure:
IE Information Notice No. 79-10
\\-l DfL660-
\\/
It
/i i
7 906290$6f :
IE Infor:ation Notice Uc. 79-10 April 16, 1979 LISTING OF IE INF0FE T!ON N!!!CES ISFUEL IN 2979 Date Issued T; Information Subject Issued N tice No.
Bergen-Paterser. Hydraulie 2/2/79 A: power rea:ter facilitier vi.h an 79-01 Shock and Evay Arrester CL or a CF 2/2/79 A;; Fue; Ps:i;ities Atten;ted Extertion -
79-02 Lev Enriched Urar.iur.
2/9/79 All power res: :r Limiterque Va.ve Geared fa:ilitiet v i. '- ar.
79-03 Litit Evitch Lutricant OL or a CF 2/16/79 All power rea:ter 79-OL Degradatier. of facilities with an Engineered OL or a CF Safety Features Use of l= proper Materials 3'21/79 All pcVer rea:ter facilities with an 79-05 in Safety-Felated Con;;r.ents OL cr CP 3 '2 ? '~9 A;; E: ders Of 79-06 Stress Analysis of Rea: tor OL cr CF Safety-Related Piping 3/26/79 All power rea:ter Rupture of Radvaste Tar.ks facilities with ar.
79-07 OL or CF 3/2B/79 All power rea:ter 79-08 Interconnection of facilities with an Contaminated Systems with OL and Pu Processir.g Service Air Syste=s Used fuel facilities As the Source of Breathing Air 3'33' 9 A;; power rea:ter Spill of Radioactively facilities with an 79-09 Conta=inated Resin OL Ene;osure Page 1 of 1 T
UNITED STATES NUCLEAR REGULATORY CO)cCSSION OFFICE OF INSPECTION AND ENFOPCDENT WASHINDTON, D.C.
20555 April 16,1979 IE Infor=ation Notice N.
79-10 NON00NPOPJCND PIPE S'JPPORT SFU~S Description of Circu= stances:
a lir.i.e d Bergen-Paters:n Pipesupport Corp: ration infer =ed the NEC that quantity of its Part 2000 Rigid Pod Strut de not meet the put:ithei inspecticn ty the NEC ir.dicated thst design eriteria.
Subseq;ent plant no noncenferring Part 2000 Pi,id Pod Struts are installed in :;eratire However, the following construction sites were identified Er units.
receiving non: enforcing struts:
Su=rer No. 1 Unit Shorehat Grand Gulf Nc. I and 2 Units Wolf Creek No.1 Unit Callaway No. I Unit Waterferd No. 3 Unit St. Lucie No. 2 Unit Washington Nuclear NO. 2 Unit Zi==er No. 1 Unit the The actual load rating of Part 2000 Rigid Fod Struts varies vi eat various tim material used for rods in the assembly.
cade fror SA-36, SA-306, grade 60 and A-10B grade 1015 materia:s.
Re-analysis indicates that the use of A-108 grade 1016 produces a product meetinc a12 published criteria for all sites; however, the use of either SA-36 or SA-306, grade 60 eaterials produces an accertat.e for sites 10 and 20.
material only for sizes 1.5 ar.d 3 but not All construction permit holders should consider conducting a reviev :
determine if Bergen-Paterson Pipesuppert Cor If so, determine if those in stock and installed meet the required design criteria.
1 of 2
Apri_ 16, 19~'s IE Information Notice No. 79-10 ift:ent This information is provided as a notification of a possibly siEr.
ion for is expected that recipients vill review the informatNo snecific acti matter. It possible applicability to their facilities.If further NEC evaluations s response is requested at this tir.e. indicate, an IE Circular or d cr NBC Regions'.
request specific licensee actions. matter, please contact the Direc Office.
Er.clo sure :
List of IE Infer.stion Notices !ssued ir. 19'9 2 of 2