r
,
ITIC4
c,J#*%
UNITED STATES
j l D }[, {
yg
t
NUCLEAR REGULATORY COMMISSION
-jy.,
REGloN lit
g
y
799 ROOSEVELT ROAD
f
g
9
GLEN ELLYN. ILLINolS 60137
$
.....
APR 4
1979
Docket No. 50-341
The Detroit Edison Company
ATTN:
Mr. Edward Hines
Assistant Vice President
and Manager Quality
Assurance
2000 Second Avenue
Detroit, MI 48226
Gentlemen:
This refers to the inspection conducted by Mr. I. T. Yin of this office
at the Enrico Fermi 2 site on March 14-16, 1979, of activities authorized
by NRC Construction Permit No. CPPR-87 and to the discussion of our
findings with Mr. T. A. Alessi and others of your staff at the conclu-
sion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Withsn these areas, the inspection consisted of
a selective examination of procedures and representative records,
observations, and interviews with personnel.
During this inspection, certain of your activities appeared to be in
noncompliance with NRC requirements, as described in the enclosed
Appendix A.
This notice is sent to you pursuant to the provisions of Sletion 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Section 2.201 requires you to submit to this office within
thirty days of your re'-eipt of this notice a written statement or
explanation in reply, Aacluding for each item of noncompliance: (1)
corrective action taken and the results achieved; (2) corrective action
to be taken to avoid further noncompliance; and (3) the date when full
compliance will be achieved.
During a telephone conversation, on March 21, 1979, between Messrs.
T. A. Alessi, T. H. Dickson and others of your staff and Messrs. I. T. Yin,
H. S. Phillips and D. H. Danielson of this office, your company agreed to
inform this office of changes made to your program and frequently report
2282
188
7906140DQ
.
.
The Detroit Edison Company
-2-
APR 4
B79
the progress relative to correcting hanger installation problems. In
addition, you agreed to inform this office, prior to lif ting the stop work
order on QA Level I hanger installations, so a member of my staff can
observe and evaluate hanger work performed to demonstrate the ef fectiveness
of the corrective action and the steps taken to prevent recurrence.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter, the
enclosures, and your response to this letter will be placed in the NRC's
Public Document Room, except as follows.
If the enclosures contain
information that you or your contractors believe to be proprietary, you
must apply in writing to this office, within twenty days of your receipt
of this letter, to withhold such information from public disclosure.
The application must include a full statement of the reasons for which
the information is considered proprietary, and should be prepared so
that proprietary information identified in the application is contained
in an enclosure to the application.
We will gladly discuss any quescions you have concerning this
inspection.
Sincerely,
-
G. Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of
Violation
2.
IE Inspection Report
No. 50-341/79-07
cc w/encls:
Central Files
Repro.uction NRC 20b
Local PDR
"
2282
189
Ronald Callen, Michigan Public
Service Commission
Eugene B. Thomas, Jr.,
At torney