Forwards IE Insp Rept 50-348/79-11 on 790312-16.No Noncompliance Noted
ML19259C349
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 03/29/1979
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Clayton F
ALABAMA POWER CO.
Shared Package
ML19259C350 List:
References
NUDOCS 7906140626
Download: ML19259C349 (2)


See also: IR 05000348/1979011

Text

~4

.

UNITED STATES

  • 880uq'o

NUCLEAR REGULATORY COMMISSION

g

.

g ,yfg>

,

'

[

REGION 11

o

5

.$

101 M ARIETTA STREET,N.W.

ATLANTA. GEORGIA 3o303

%...../

MAR 2 91979

In Reply Refer To:

RIICMH

50_-348/79-11

Alabama Power Company

ATTN:

F. L. Clayton, Jr.

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by C. M. Hosey of this office on

March 12-16, 1979, of activities authorized by NRC License No. NPF-2 for the

Farley Unit I facility, and to the discussion of our findings held with

W. G. Hairston, III at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items.

The status of these items is

discussed in the enclosed report.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room. If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within

20 days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the

basis of which it is claimed that the infomation is proprietary, and should

be prepared so that proprietary information identified in the application is

contained in a separate part of the document. If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document Room.

2282 233

906140b y

'

,

,

.

MAR 2 91979

.

Alabama Power Company

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

-

i

t

J. T. Sutherland, Chief

Fuel Facility and Materials

Safety Branch

Enclosure:

Inspection Report No. 50-348/79-11

cc w/ encl:

A. R. Barton

Executive Vice President

P. O. Box 2641

Birmingham, AL 35291

'

H. O. Thrash

Manager-Nuclear Generation

P. O. Box 2641

2282 234

Birmingham, AL 35291

C. Biddinger, Jr.

Manager-Corporate Quality Assurance

P. O. Box 2641

Birmingham, AL 35291

W. G. Hairston, III

Plant Manager

Drawer 470

Ashford, AL 36312

R. E. Hollands, Jr.

QA Supervisor

P. O. Box U

Ashford, AL 36312

.