ML19259C195
Jump to navigation
Jump to search
| ML19259C195 | |
| Person / Time | |
|---|---|
| Site: | Cherokee |
| Issue date: | 05/11/1979 |
| From: | DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML19259C194 | List: |
| References | |
| 79-01-5PS, 79-1-5PS, NUDOCS 7906140336 | |
| Download: ML19259C195 (1) | |
Text
.
3 Report No.: 79/01-SPS-491/492/493 Report Date: May ' ',1979 Facility:
Cherokee Nuclear Station Identification of Deficiency: Recall of pipe fittings Description of Deficiency:
Tube Turns Division, Louisville, Kentucky advised Duke Power Company that welding fittings bearing tot Number W6719 contained erroneously identified high carbon steel material.
Analysis of Safety Imolications:
Cracks will occur when high carbon material is welded; however, it is possible that cracks would go undetected.
Corrective Action:
All material was shipped from Cherokee to Tube Turns on April 12, 1979.
==
Conclusion:==
All required action completed.
2278 j
t O J
- 7906140s?5 6
-.