ML19259C156

From kanterella
Jump to navigation Jump to search
Forwards LER 79-031/03L-0
Date released: 09/30/2019 Download: ML19259C156


LER 79-031/03L-0 on 790510:while Performing Leak Rate Test, Discovered Four MSIVs Exceeded Leakage Rate.Caused by Cracks in Stellite.Disks Replaced.Valves Reassembled & Tested Satisfactorily
ML19259C157
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 06/07/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19259C157 (1)
Forwards LER 79-031/03L-0
ML19259C155
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 06/07/1979
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19259C155 (1)