Monthly Operating Rept for Jan 1979
ML19259B413
Person / Time
Site: Cooper Entergy icon.png
Issue date: 01/31/1979
From: Borer P
NEBRASKA PUBLIC POWER DISTRICT
To:
Shared Package
ML19259B410 List:
References
NUDOCS 7902090264
Download: ML19259B413 (5)


Text

.-

4*

OPERATING DATA REPORT 050-0298 DOCKET NO.

DATE 2-2-79 CONIPLETED BY P. J. Borer TELEPHONE 402-825-1811 OPERATING STATUS N tes

1. Unit Name:

Cooper Nuclear Station J nuary 1979

2. Reporting Period:

2381

3. Licensed Thermal Power (5 twt): -0
4. Nameplate Rating (Gross SlWe):

778

5. Design Electrical Rating (Net 51We):

7

6. Sf aximum Dependable Capacity (Gross SIWE):
7. 51aximum Dependable Capacity (Net SIWE):

S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To Which Restricted,if Any (Net SIWE);
10. Reasons For Restrictions,If Any:

he This 51onth Yr..to.Date Cumulative

11. Hours in Reporting Period

_ 40,225 744 744 744 744

13. Reactor Resene Shutdown Hours 0

0

_ 4,198.9

12. Number Of Hours Reactor Was Critical 0

744 744 33,34/.)

14. Hours Generator On.Line
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (SIWH) 1,626,600 1,626,600 62,050,758
17. Gross Electrical Energy Generated (5tWH) 542,060 _

54?,060 19,899,926

18. Net Electrical Energy Generated (5tWH) 525,045 525,045 19,188,384
19. Unit Service Factor 100.0 100.0 83.4
20. Unit Availability Factor 100.0 100.0 83.4 92.4 92.4 62.4
21. Unit Capacity Factor (Using SIDC Net)
22. Unit Capacity Factor (Using DER Net) 90.7 90.7 61.3 0.0 0.0 4.6
23. Unit Forced Outage Rate
24. Shotdowns Scheduled Over Next 6 51onths (Type. Date, and Duration of Each >:

Refueling, April 1,1979, Four Weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation 1:

Forecast Achiesed INITIA L CRITICALITY INITI AL ELECTRICITY CON 151ERCIAL OPER ATION 7 9 0 2 0 9 0 2M mm

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

050-0298 UNIT Cooper Nuclear Stat.

February 2, 1979 DATE COMPLETED BY P. J. Borer TELEPHONE 402-825-3811 MONT11 January 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)

( MWe-Net) 723 1

516 g7 676 2

gg 720 3

760 721 39 756 686 4

20 730 659 5

21 687 6

22 761 662 7

3 764 8

765 734 24 760 9

25 723 10 733 26 720 11 731 27 704 12 721

,3

'43 759 622 13 29 g4 733 695 30 15 730 732 3;

746 16 INSTRUCT 10NS On this format, list the aurage daily umt power levelin MWe Net for each day in the reportmg month. Compute to the nearest whole mepwatt.

(9/77)

DOCKET NO.

050-0298 UNIT SilU 1' N5 AND POWER REDUCI10NS UNIT N AM E Cooper Ntw1onr Station DATE Febronrv 9 1979 WMPl.ETED BY hL ber REPORT MONIll Janunry 1979 TEl.EPil0NE 402-825-3811 "t

.; g 3

k$

E l.icensee

,E -t, Cause & Corrective 3

Action to 3g 2,

.5 s 5 Event

{y gO No.

Da te o

g3 y

~ g =2 Report n in U Prevent Recurrence F-e o

u 6

79-1 790128 S

0 H

4 N/A N/A N/A Reduced power for main turbine valve testing.

I 2

3 4

E: Forced Itcason:

Method:

Exhibit G -Instructions S: Scheduled A-Eiluipment Failure (Explain) 1-Manual for Picparation of Data Il-Maintenance of Test 2-Manual Scram-Enti) Sheets for 1.icensee C. Refueling 3-Automatic Scram.

Event Report (l.I'R)I ile (NURin D Regulatory Restriction 4-Ot her ( E xplain )

0161)

E-Operator Training & License lixamination F-Administ rative 5

G-Operational Er ror (Explain) 1:xl.ibit 1 - Same Source (9/77)

Il-Ot her ( E xplain)

COOPER NUCLEAR STATION OPERATIONS NARRATIVE January 1979 The unit operated at an average net output of about 706 MWe.

Power was reduced for main turbine valve testing on January 28th.

, ' ~

Cooper Nuclear Station Refueling Information Request Enclosure to Monthly Operating Report January 1979 1.

Facility - Cooper Nuclear Station 2.

Scheduled Refueling S/D - April 1,1979 3.

Scheduled Refueling S/U - April 27, 1979 4.

License amendment required? - Yes a.

The Rod Block Monitor setpoint and operating Minimum Critical Power Ratio (MCPR) limits are being revised.

b.

The densification power spiking penalty factor is being deleted for 8x8 fuel, c.

Various references, etc.

5.

License Document Submittal - January 30, 1979 - Reload Licensing Submittal - NED0-24170 and Proposed Technical Specifications 6.

New licensing considerations - None 7.

Fuel assemblies currently (a) In Core - 548 (b) Spent Fuel Storage - 284 8.

Licensed spent fuel storage capacity - 23',6 assemblies 9.

Last dischar:. assuming present capacity - 1996