e
.
~l&
'
- g REGuq'o
UNITED STATES
,
NUCLEAR REGULATORY COMMISSION
[V '~1W
g
$
REGloN 11
$
)w
g
.-
1
-
.c
101 M ARIETTA STREET. N.W.
ATLANTA. G EoRGI A 30303
o
%...../
DEC 2 9 yyg
In Reply Refer To:
RII:EJV
50-327/78-42
50-328/78-28
Tennessee Valley Authority
'
Attn:
Mr. N. B. Hughes
Manager of Power
830 Power Building
Chattanooga, Tennessee 37401
Gentlemen:
This refers to the inspection conducted by Mr. E. J. Vallish of this
office on December 11-14, 1978 of activities authorized by NRC Construc-
tion Permit Nos. CPPR-72 and CPPR-73 for the Sequoyah Nuclear Plant,
Units 1 and 2 facilities, and to the discussion of our findings held
with Mr. G. G. Stack at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulation. a copy of this letter and
the enclosed inspection report will be placeu in the NRC's Pub 1fc
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure.
Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
?902096107
.
.
.
.
Tennessee Valley Authority
-2-
DEC 2 9 spg
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
harles
Mu rp gr ,
hief
Reactor Construction and
Engineering Support Branch
Enclosures:
Inspection Report Nos. 50-327/78-42
and 50-328/78-28
cc w/ enclosures:
Mr. J. E. Gilleland
Assistant Manager of Power
830 Power Building
Chattanooga, Tennessee 37401
Mr. G. G. Stack, Project Marager
Sequoyah Nuclear Plant
Post Office Box 2000
Daisy, Tennes;ee 37319
Mr. J. M. Ballentine
Plant Superintendent
Sequoyah Nuclear Plant
Post Office Box 2000
Daisy, Tennessee 37319
Mr. J. F. Cox
400 Conmerce Street
W9D214
Knoxville, Tennessee 37902