ML19259B048

From kanterella
Jump to navigation Jump to search
Amend 46 to License DPR-65 Modifies Tech Specs by Changing Acceptable Resistance Temp Detector Response Time in Reactor Protection Sys to Less than or Equal to 10-S
ML19259B048
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/28/1978
From: Reid R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19259B049 List:
References
NUDOCS 7901160021
Download: ML19259B048 (7)


Text

'/

S, UNITf D STATES

[v NUCLEAR REGULATORY COMMISSION j 'h j

WASHINGTON O. C. 20555 Q'WN THE CONNECTICUT LIGHT AND POWER COMPANY, THE HARTFORD ELECTRIC LIGr1T COMPANY, WESTERN MASSACHUSETTS ELECTRIC COMPANY, AND NORTHEAST NUCLEAR ENERGY COMPANY 00CXET NO. 50-336 MILLSTONE NUCLEAR POWER STATION, UNIT NO. 2 AMENDPENT TO FACILITY OPERATING LICENSE Amencment No. 46 License No. OPR-65 1.

The Nuclear Regulatory Commission (the Commissbn) has found that:

A.

The application for amendment by The Connecticut Lignt and Power Company, The Hartford Electric Light Company, Western Massachusetts Electric Company and Northeast Nuclear Energy Compan, (the licensees) dated October 24, 1977, as supplemented March 21, 1978, complies with the standards and requirements of the Atomic Energy Act'of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; 3.

The facility will operate in confornity with the application, the provisions of the Act, and the rules and regulations of tne Ccmmission; C.

There is reasonable assurance (1) that the activities authori;:ed by this amencment can be conducted without endangering the health and safety of the public, and (11) that such activitie.'

will be conducted in ccmpliance with the Commission's regulations; D.

The issuanca of this amendment will not be inimical to tne ccmmon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all acclicable requirements have been satisfied.

790116002,

. 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. OPR-65 is hereby amended to read as follows:

(2) Technical Saecifications The Technical Specifications contained in Accendices A and B, as revised through Amendment No. 46, are hereby incorporated in the license. T';e licensees shall operate the facility in accordarce with the Technical Specifications.

3.

This license amencment is effective as of the date of its 'asuance.

FOR THE NtJCLD R REGi!LATCRY CCt1 MISSION ig 4A ata'O A

1

/

u Rcbert W. Reid, Chief Operating Reactors Grar:ch #4 Division of Operating Reactors

Attachment:

Char.ges to the Technical Saecifications Jam of Issuance:

December 28, 1978

ATTACHMENT TO LICENSE AMENDMENT NO.

FACILITY OPERATING LICENSE NO. OPR-65 00CKET NO. 50-336 Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages. The revised pages are identified by Amendment number anu contain vertical lines indicating the area of change. The corresponding overleaf pages are also provided to maintain document completeness.

Paces 2-8 2-9 3/4 3-6 s

0.6,o u

.,.___., lid:.

.r--

__..-t.___;

e:5:-@L?)En C~Z liku =~#

El:

2=

r_.:= g- ;- n -_

UNACCEPTABLE OPERATION

____r' REGION

.t___..._. _.u -

n_

0.4

_. =

g.

2:;g_;; j,4g3;.Q_;g

_-..__.l____._a_

.._.-:=.--:----:

F:n

".5f.:. _ _

.'.'Tif5'-~!":: h1

~

- ' " = = ~

Q.2

_._...[jia.i-53.E ~' __ "i i....._____ _._

~_[Q~ ~,F-iii : t-dE:iE

-~i r

, f '.

s._.;M_._~ _

__.._.s

~_.].51;.____., CE=E -

. :.-3HE-- ;N F z

-N. _..,

ACCEPTABLE OPERATION

~

_--.~-'.-"_~_T i

7__ _.-. _= = U =..r2 l..b.

E0-Y 0

..,_ _.. R EGION.., _,

=-

__ t h -.-/:.,

.2;

____..:=_.--

_u....

_ __.. /.. :!

...t : :-..= :

-r ::--- ----i.. _._

.;i:[T::i.i_i_;'j..~..'.i' i.i fi:i. :--

~

_/,'t.

..l

- El 4 ! M =i-Ed- -._

___fhl-R : !

. : E._L" :E. E..! _E_i -R.E '

. 3.

a

--- ~; ':3@"=-lim:

_:-f t

..__.y____ /_--

-i

- :1

=2__:=:1 n-

~J Trff:T-

~

-0.4

_ _ _..... ;..u -. ; _-. _; 7m. :;. - _

--- UNACCEPTABLE OPERATION Z.9 REGION

-0.6

~

0 0.2 (L4 0.6 0.8 1.0 1.2 QR2 FIGURE 2.2 2 Local Power Density - High Trip fetpoint Part 2 (OR2 Versus Y )i MILLSTONE - UNIT 2 2-7 Arenenen "o.

38

1.2 O ng = Ag X GR3 j^:

g AND f'.

PS = 1396 X Qoug + 115 X T - 6230

/E.._

l 1.0 i

,fi _ _

..s.,...

,. ' +

p.

- -.+

0.86465 Nww--Vy-~ "--- 1*00 v-0.8

  1. ._-.-t; ^ : = ---- --

_f g

1.

-.. _ f t=y.

=-4_.-

t :-- ::.t..... !

-h 0.80 =:-- '~.". "~~

5d

~

f j'-

.p' L-.._..-.~......

j

  • ~ ~ ~ ~ ~

CR, 0.6 x.

/

/

f

,.f

---. r. t _..

-s

....3-.--

1

-~

0.4 6 0.22

/P 0.2

[ _ _.._

O^

O Q.2 0.4 0.6 0.8 1.0 1.2 FRACTION OF RATED THERMAL, PCWER FIGURE 2.24 Thermal Margin / Low Pressure Trio Setpoint (Part 2 Fraction of RATED THERMAL POWER Versus QRj)

MILLSTCitE - UNIT 2 2 -9 Amendment No. 32,46

&W

TABLE 3.3-1 (Continued)

ACTION STATEMENTS 1.

All functional units receiving an input from the bypassed channel are also placed in the bypassed condition.

2.

The Minimum Channels OPERABLE requirement is met; however, one additional channel may be removed from service for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.1.1 provided ona of the inoperable channels is placed in the tripped condition.

With the number of OPERABLE channels one less than the ACTION 3 Total Number of Channels and with the THERMAL POWER level:

a.

5,5% of RATED THERMAL POWER, immediately place the inoperable channel in the bycassed condition, restore the inoperable channel to CPERABLE status prior to increasing THERMAL POWER above 5% of RATED THERMAL POWER.

b.

> 5% of RATED THERMAL POWER, power operation may continue.

With the number of channels OPERABLE one less than required ACTION 4 by the Minimum Channels OPERABLE requirement, immediately verify comoliance with the SHUTDOWN MARGIN requirements of Specification 3.1.1.1 or 3.1.1.2, as applicable, and at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> thereafter.

MILLSTONE - UNIT 2 3/4 3-5

__