ML19257D853

From kanterella
Jump to navigation Jump to search
Forwards LER 80-006/03L-0
Date released: 09/28/2019 Download: ML19257D853


LER 80-006/03L-0:on 800103,during Normal Startup,Control Rod 26-07 Had No Position Indication at Notch 48.During 800109 Startup,Rod 34-35 Had No Indication at Notch 7.Caused by Faulty Reed Switches in Prototypical Inlet Piping Probes
ML19257D854
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/29/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19257D854 (1)
Forwards LER 80-006/03L-0
ML19257D852
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/29/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19257D852 (1)