Y/L paarc
,c, UNITED STATES c.
(%
NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 JAN 14 1980 Docket flo. 50-339 Mr. W. L. Proffitt Senior Vice President - Power Operations Virginia Electric & Power Company P. O. Box 26666 Richmond, Virginia 23261
Dear Mr. Proffitt:
SUBJECT:
REQUEST FOR ADDITIONAL IllFORMATION FOR THE REVIEW 0F THE fl0RTH A'lflA POWER STATI0tl, UNIT 2 FIrlAL SAFETY ANALYSIS REPORT (FSAR)
As a result of our continuing review of the North Anna FSAR, we find that we need additional information to complete our evaluation.
The specific information required is listed in the enclosure.
Our review schedule is based on the assumption that this additional information will be available for our review by January 25, 1980.
If you cannot meet this date, please inform us within seven days after receipt of this letter so that we may revise our schedule accordingly.
Please contact us if you desire any discussion or clarification of the enclosed request.
Sincerely, W U. fa~
Olan D. Parr, Chief Light Water Reactors Branch No. 3 Division of Project Management
Enclosure:
Request for Additional Information
!845
- 21 cc w/ enclosure:
See next page 80ul3103 k A
Mr. W. L. Proffitt JAN 14 1980 cc:
Mr. Anthony Ganbaradella Cl arence T. Ki pps, Jr., Esq.
Office of the Attorney General 1700 Pennsylvania Avenue, N.W.
11 South 12th Street - Room 308 Washington, D. C.
20006 Richmond, Virginia 23219 Carroll J. Savage, Esq.
Richard M. Foster, Esq.
1700 Pennsylvania Avenue, N.W.
Musick, Williamson, Schwartz Washington, D. C.
20006 Leavenworth & Cope, P. C.
P. O. Box 4579 Mr. James C. Dunstan Boulder, Colorado 80306 State Corporation Connission Commonwalth of Virginia Michael W. Maupin, Esq.
Blandon Building Hunton, Williams, Gay & Gibson Richmond, Vi rginia 23209 P. O. Box 1535 Richmond, Virginia 23212 Alan S. Rosenthal, Esq.
Atomic Safety and Licensing Appeal Board Mrs. June Allen U.S. Nuclear Regulatory Comnission 412 Owens Drive Washington, D. C.
20555 Huntsville, Alabama 35801 Michael C. Farrar, Esq.
Mrs. James Torson Atomic Safety and Licensing Appeal Board 501 Leroy U.S. Nuclear Regulatory Commission Socorro, New Mexico 67G01 Washington, D. C.
20555 Mrs. Margaret Dietrich Dr. John H. Buck Route 2, Box 568 Atomic Safety and Licensing Appeal Board Gordonsville, Virginia 22942 U.S. Nuclear Regulatory Commission Washington, D. C.
20555 Willian H. Rodgers, Jr., Esq.
Georgetown University Law Center Atomic Saferv and Licensing Board Panel 600 New Jersey Avenue, N. W.
U.S. Nuclea Regulatory Conmission Washington, D. C.
20001 Washington, D. C.
20555 Mr. Peter S. Hepp Mr. Michael S. Kidd Executive Vice President U.S. Nuclear Regulatory Commission Sun Shipping & Dry Dock Company P. O. Box 128 P. O. Box 540 Spotsivania, Virginia 22553 Chester, Pennsylvania 19013 Dr. Paul W. Purdon Mr. R. B. Briggs Department of Civil Engineering Associate Director Drexel University 110 Evans Lane Philadelphia, Pennsylvania 19104 Oak Ridge, Tennessee 37830 1845 22
Mr. W. L. Proffitt JAN 14 1980 cc: Dr. Lawrence R. Quarles Apartrent No. 51 Kendal-at-Longwood Kennett Square, Pennsylvania 19348 Mr. Irwin 8. Kroot Citizens Energy Forum P. O. Box 138 McLean, Virginia 22101 James B. Dougherty, Esq.
Potomac Alliance 1416 S Street, N.W.
Washington, D. C.
20009 W. R. Cartwright, Station Manager P. O. Box 402 Mineral, Virginia 23117 W. L. Stewart, Manager P. O. Box 315 Surry, Virginia 23883 Y
l845
- 23
ENCLOSURE Request for Additional Information North Anna Power Station, Unit 2 Docket No. 50-339 14.0 Initial Tests 14.6 It has come to our attention that although some applicants had committed to Regulatory Guide 1.68, they did not intend to conduct full-load tests of some 4160-480 volt transformers supplying power to vital buses.
Your test description in FSAR Chapter 14 does not contain sufficient detail for us to determine if you intend to conduct such a test.
It is our position that full-load tests of vital buses must be conducted including all sources of power supplies to the buses.
Modify your test description to indicate that this testing will be conducted in accordance with Regulatory Guide 1.68.
State your intent to comply with our requirements.
1845 224