U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION'I Report No.

70-371/79-13 Docket No. _70-371 License No.

SEM-368 Safeguards Group 1

Licensee:

United Nuclear Corporation Uncasville, Connecticut 06382 Facility Name:

Naval Products Division Inspection At:

Uncasville, Connecticut Inspection Conducted:

July 12-18, 1979 Date of Last Material Control and Accounting Inspection Visit: July 2-3, 1979 Type of Inspection: Unannognced Material Centrol & Accounting 4..

IL /L 9

Inspectors:

c 1'.

Cohen, Chemist date f f,

~f

/d * /2 '?9 G. Smith, Safegu@ds Auditor date

[

tNA f <2 7-7 9 E. Woltngr, Safegu rds Auditor date

/k IV 29 Approved by:

~

s-

~

date

'd.

H. Joyner, Chief, Nuclear Material Control Support Secti'dn, Safeguards Branch Inspection Summary:

Area s_ In_ spec ted :

Observation of physical inventory.

The inspection involved 160 inspector-hours on site by three NRC inspectors and was begun during the regular hours.

Resalts:

The licensee was found to be in coupliance wi th NRC requirements within the area examined during the inspection period except for the following three items:

1.

Items on hand at the time of the May 18, 1979 physical inventory were not tamper-safed or masured for the inventory.

(Infraction).

2.

The posted SNM zone limits for the fuel Crib Storage Area work zone werc exceeded.

( In f rac tinn) 1843 282 Region I Form 166 (August 19/9) g

Inspection Summary 2

3.

Several items in the inventory, originally parts of larger components, were found to have the entire SNM content of the larger components assigned to the subparts.

Pending satisfactory reconciliation of the situation by the licensee, this matter is considered unresolved.

e~

1843 283

REPORT DETAILS 1.

Key Pe sons Contacted

  • D. Ganley, General Manager T. Collopy, Manager, Nuclear Safeguards
  • A. Wolvendyk, Nuclear Material Coordinator
  • R. Gustafson, Security Director
  • R.

Schwensfeir, Criticality Safety Specialist

  • denotes those present at the exit interview.

2.

Exit Interview The inspectors met with licensee representatives (denoted in Paragraph

1) at the conclusion of the inspection on July 18, 1979.

The inspectors summarized the scope and findings of the inspection.

3.

Unresolved Items Unresolved items are matters about which more information is required in order to ascertain whether they are acceptable items, items of non-compliance or deviations.

An unresolved item was identified during the inspection.

Several items in the inventory, originally parts of larger components, were found to have the entire SNM content of the larger components assigned to the subparts.

Pending satisfactory reconcilation of this situation by the licensee, this matter is considered unresolved (Para-graph 5).

4.

Independent Inpection Effort The inspectors observed that the posted criticality control limits were exceeded by the licensee on July 13, 1979 in the work zone of the fuel Crib Storage Area.

This is an item of noncompliance and is discussed in Paragraph 6.

5.

MC 85212B - Physical Inventory Two items of noncompliance were noted:

The licensee (1) failed to have tamper-safed or measure two items on hand at the time of the May 18, 1979 physical inventory and (2) exceeded the posted SNM zone limits for the work zone of the Fuel Crib Storage Area.

I843 284