Thomas J. Martin Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430-8316 Vice President Engineering and Construction December 5, 1979 Mr. Boyce H. Grier, Director U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406
Dear Mr. Grier:
NRC INSPECTION REPORT 50-354/79-07 AND 50-355/79-07 NO. 1 AND 2 UNITS HOPE CREEK GENERATING STATION We have received and reviewed the report of your inspection conducted on September 25-27, 1979.
The report was trans-mitted with your letter of October 26, 1979 and received on November 5, 1979.
Our response for the item of noncompli-ance is as follows:
The subject inspection identified an infraction regarding lack of complete adherence to Bechtel's Specific Work Plan /
Procedure, SWP/P-14, Revision 4.
The following corrective actions have been taken relative to this infraction:
1.
Corrective steps which have been taken by Bechtel and the results achieved:
a.
Field Engineering has initiated a log to assure weekly response to maintenance discrepancies re-ported by Quality Control.
'b.
The Resident Field Engineer (RFE) has provided es-timated completion dates to the Project Construc-tion Quality Control Engineer (PCQCE) regarding maintenance discrepancies, including four po-tentially nonconforming items (Nos. 21, 22, 23, and
- 24) on a maintenance inspection punchlist observed during NRC Inspections 50-354/79-7 and 50-355/79-7.
c.
The RFE is currently responding to the PCQCE on a weekly basis with " estimated completion dates" and 1833 185
" action taken."
This information is reflected in weekly issues of the maintenance acceptance punch-list maintained by the PCQCE.
8 00130 o sr7;
Mr. Boyce H.
Grier 12/5/79 d.
Jobsite Quality Assurance has monitored corrective action progress, including review of the maintenance and inspection punchlist (weekly issue) to assure completion of the above corrective steps.
2.
Corrective steps which were/will be taken to avoid further items of noncompliance:
a.
All responsible personnel were reinstructed as to specific Work Plan / Procedure (SWP/P-14) requirements for weekly action.
b.
Compliance with Bechtel's Specific Work Plan /Proce-dure SWP/P-14 will be verified periodically by Qual-ity Assurance audits.
3.
The date when full compliance will be achieved:
All actions for this item were completed as of October 12, 1979.
Verification of full compliance was completed on October 22, 1979.
If you require additional information, we will be pleased to discuss it with you.
Very truly yours,
,,s-CC:
Office of Inspection and Enforcement Division of Reactor Construction and Inspection Washington, D.
C.
H.
E.
Morris (Bechtel) 1833 186 GP 10 1/2