Ro:On 800107,improper Operation of Meteorological Monitoring Instrumentation from 791224 to 800107 Was Discovered.Caused by Transmitter Leads Inadvertently Reversed During Installation.Discrepancy Corrected 800107
ML19257C646
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 01/17/1980
From: Shaller D
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
References
NUDOCS 8001290542
Download: ML19257C646 (1)


Text

D5f1>

S p" ) INDIANA & MICHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bndgman, Michigan 49106 (616) 465-5901 Jaruary 17, 1980 Mr. J.G. Keppler, Regional Director Of fice of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-58 Docket No. 50-315

Dear Mr. Keppler:

This report is submitted as required by Technical Specification 3.3.3.4, as the required Meteorological Monitoring Instrumentation was operating improperly from December 24, 1979, until January 7, 1980.

A Special Report was previously submitted on December 28, 1979, concern-ing the inoperability of the Meteorological Instrumentation while install-ing new equipment (copy attached).

The installation of the new equipment was completed on December 24, 1979.

On January 7, 1980, while experiencing high winds, it was discovered that recorded wind direction was 180 f rom actual wind direction.

Investigation revealed enzt during the installation of the new Meteorolo-gical Monitoring Inr.rumentation, the transmitter leads were inadvertantly reversed. This resulted in the 180 wind direction error.

The discrepancy was corrected on January 7, 1980.

All wind directions were recorded between the dates of December 24, 1979, and January 7, 1980.

However, the wind direction data for this period was recorded 180 from actual wind direction.

Sincerely, D.V. Shaller Plant Manager 1822 120

/bab cc:

J.E. Dolan G. Olson R.S. Hunter J.M. Hennigan

.g, Q R.W. Jurgensen PNSRC R.F. Kroeger J.F. Stietzel 003 R.W. Kilburn E.L. Town]ey g

R.E. thsse RO:III Dir., IE (20 copies)

R.C. Callen MPSC Dir., MIPC (2 copies) f G. Charnoff, Esq.

Directorate of Licensing i

W. Lavallee EPRI 8001290

h D

.r*=

% INDIANA & MICHIGAN POWER COMPANY DONALD C. Co0K NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 (616) 465 5901 December 28, 1979 Operating License DPR-58 Docket # 50-315 Mr. J. G. Keppler, Regional Director Office Of Inspection and Enforcement U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

This report is submitted as required by Technical Specification 3.3.3.4, as the required Meteorological Monitoring Instrumentation was inoperable from December.12,1979 until December 24, 1979.

(

ihe Meteorological Monitoring Instrumentation was taken out-of-service on December 12, for the installation of new meteorological equipment, of a modified design, to improve Meteorological System operability during the win-ter months. The completion of the new equipment installation was delayed by several days of adverse weather conditions, preventing any work on the weather tower.

After completing the installation and calibration of the new equipment, the Meteorological Monitoring Instrumentation was determined to be operable on December 24, 1979. No gaseous releases were made during this time period.

Very.truly yours, A

D. V. Shaller Plant Manager

/ms cc: J. E. Dolan G. Olson R. S. Hunter J. M. Hennigan R. H. Jurgensen PNSRC 3 o q/s j ( R. F. Xroeger J. F. Stietzel i u c /. R. Kilburn E. L. Townley R. E. Masse R0:III Dir., IE (20 copies) R. C. Callen MPSC Dir., MIPC (2 copies) C. Charnoff, Esq. Dir. of Licensing .}}