ML19257C460
| ML19257C460 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 01/17/1980 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Burstein S WISCONSIN ELECTRIC POWER CO. |
| References | |
| NUDOCS 8001290159 | |
| Download: ML19257C460 (1) | |
Text
- pa meo o
UNITED STATES 8 3 7, [,j NUCLEAR REGULATORY COMMISSION
.r REGION 111 k
799 ROOSEVELT ROAD 8
GLEN ELLYN. ILLINOIS 60137
%,..... j JAlil 7 w u Docket No. 50-266 Docket No. Sr 301 Wisconsin E?.2ctric Power Company ATTN:
Mr. Sol Burstein Executive Vice President Power Plants 231 West Michigan Milwaukee, WI 53201 Gentlemen:
The enclosed IE Circular No. 80-01 is forwarded to you for information and if applicable necessary action in accordance to the attached General Electric Company Service Advice 721-162.2, No written response to this Circular is required.
If you have any questions related to the subject, please contact this office.
Sincerely,
%.nb }b
(/Jamcs G. Kepp er Director
Enclosures:
1.
IE Circular No. 80-01 2.
GE Service Advice 721-162.2 cc w/encls:
Mr. G. A. Reed, Plant Manager Central Files Director, NRR/DPM Director, NRR/ DOR C. M. Trammell, ORB /NRR PDR Le, cal PDR NSIC TIC
'l839 054 Sandra A. Bast, Lakeshore Citizens for Safe Energy Mr. John J. Duffy, Chief Boiler Inspector, Department of Industry, Labor and Human Relations 001290 15 7 h8