ML19257C458
| ML19257C458 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 01/17/1980 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Bryan J UNION ELECTRIC CO. |
| References | |
| NUDOCS 8001290156 | |
| Download: ML19257C458 (1) | |
Text
an mace o
8
~,,
UNITED STATES NUCLEAR REGULATORY COMMISSION TiG 3,, (
n
$J E
REGION lli
[
799 ROOSEVELT ROAD o
%/
o GLEN ELLYN, ILLINOIS 60137 JAN17 E80 Docket No. 50-483 Docket No. 50-486 Union Electric Company ATTN:
Nr. John K. Bryan Vice President - Nuclear P. O. Box 149 St. Louis, MO 63166 Gentlemen:
The enclosed IE Circular No. 80-01 is forwarded to you for information and if applicable necessary action in accordance to the attached General Electric Company Service Advice 721-162.2. No written response to this Circular is required.
If you have any questions related to the subject, please contact this office.
Sincerely,
&SN vJames G. Kepp er Director
Enclosures:
1.
IE Circular No. 80-01 2.
GE Service Advice 721-162.2 cc w/encls:
Mr. W. H. Weber, Manager, Nuclear Construction Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC Region I & IV 048 Ms. K. Drey Mr. Ronald Fluegge, Utility Division, Missouri Public Service Commission 8001L9u Ib