ML19257C456

From kanterella
Jump to navigation Jump to search
Forwards IE Circular 80-01, Svc Advice for GE Induction Disc Relays. No Response Required
ML19257C456
Person / Time
Site: Davis Besse 
Issue date: 01/17/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
References
NUDOCS 8001290154
Download: ML19257C456 (1)


Text

UNITED STATES

^o NUCLEAR REGULATORY COMMISSION b)'

// 7, 3

'3 E

REGION ill 799 ROOSEVELT ROAD o ~ \\/[o GLEN ELLYN, ILLINOls 60137 JAN I7 7980 Docket No. 50-346 Toledo Edison Company ATTN:

Mr. Richard P. Crouse Vice President Energy Supply Edison Plaza 300 Madison Avenue Toledo, OH 43652 Gentlemen:

The enclosed IE Circular No. 80-01 is forwarded to you for information and if applicable necessary action in accordance to the attached General Electric 721-162.2. No written response to this Circular is Company Service Advice If you have any questions related to the subject, please contact required.

this office.

Sincerely,

%b$

yJames G. Kep er Director

Enclosures:

1.

IE Circular No. 80-01 2.

GE Service Advice 721-162.2 cc w/encls:

Mr. T. Murray, Station Superintendent Central Files Director, NRR/DPM

]'

m ector, NRR/ DOR Local PDR NSIC TIC Harold W. Kohn, Power Siting Commission Helen W. Evans, State of Ohio 9

80012so /Stf